Sterling SGFE Adjusting the suction tube, If conditions points 3 + 4 are not fulfilled

Page 31

Adjusting the suction tube

4.5. Adjusting the suction tube

To guarantee a trouble-free operating run, the suction tube must be exactly ad- justed.

1. The suction tube should be placed in the basic setting

In the basic setting, the inner pipe of the suction tube sticks out of the outer pipe

approx. 120-160 mm

with Ø 40 mm

.

(4.72-6.30 in)

with (1.67 in)

approx. 150-180 mm

with Ø 50 mm

. . . . . . .

(5.91-7.19 in)

with (1.97 in)

approx. 180-200 mm

with Ø 65 mm

. . . . . . .

(7.19-7.97 in)

with (2.66 in)

2.Start the conveying process.

3.Observe the flexible line on the suction tube.

The flexible line must not be describing any pulsating movements. 4. Observe the flexible line on the separator.

The supply hose may only move when conveying is taking place.

If conditions (points 3 + 4) are not fulfilled:

Pull the inner pipe further out of the outer pipe until the jerky conveying stops.

If the conditions (points 3 + 4) are fulfilled:

Push the inner pipe slowly into the outer pipe, until a pulsating of the flexible line or a jerky conveying starts.

Pull the inner pipe back another bit, until the lines have stopped pulsing.

Select the adjustment between the two pipes in such a way that that there is al- ways sufficient airflow in the material line.

If the conveying is proceeding satisfactorily, tighten the wing screw on the suction tube.

SM4-618

Maintenance 4-7

Image 31
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Electrical manual Assembly instructionsTechnical data Spare parts list Accessories Functional descriptionGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentSignal times flap B01 Setting the basic parametersChanges only after consultation with Sterling Service Line clearing B09 Setting the basic parameters Conveying time B05Emptying time B14 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If conditions points 3 + 4 are not fulfilled Adjusting the suction tubeIf the conditions points 3 + 4 are fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Transport InstallationMaterial feed Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual