Sterling SGFE operating instructions Checking the direction of rotation of the vacuum generator

Page 29

Checking the direction of rotation of the vacuum generator

4.3. Checking the direction of rotation of the vacuum generator

Start a conveying procedure.

Wait until the vacuum generator begins to operate.

Observe the rotational direction arrow on the vacuum generator housing.

Stop the conveying procedure.

Wait until the blower has come to a standstill.

Switch off the unit.

If the vacuum generator rotates in the wrong direction, correct the direction by changing the poles of two phases.

»

F

Electrical connections should only be carried out by trained staff.

Observe the regulations of your local Electricity Board.

The wrong direction of rotation may lead to major defects or may interfere with the function of the vacuum generator.

A proper conveyance is not possible.

SM4-618

Maintenance 4-5

Image 29
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Technical data Spare parts list Accessories Assembly instructionsFunctional description Electrical manualGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentChanges only after consultation with Sterling Service Setting the basic parametersSignal times flap B01 Emptying time B14 Setting the basic parameters Conveying time B05Line clearing B09 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If the conditions points 3 + 4 are fulfilled Adjusting the suction tubeIf conditions points 3 + 4 are not fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Material feed InstallationTransport Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual