The unit works on the pneumatic conveying principle. According to this, a vacuum generator (A) creates a vacuum, which extends through the pipe ducts and hose assemblies (B), through the separators (C) until it reaches the material take-up assembly (D).

The material which has been conveyed is than separated from the air inside the separator.

Depending on conveyor control system (E) and hopper loaders time conveying mode or probe conveying mode with conveying time used as monitoring time is possible.

A filter cartridge (F) in front of the vacuum generator purifies the aspirated air.

&

Conveying is not possible without movement of air in the ma- terial line.

If the hopper loader reports a lack of material, the conveying is started.

Following the conveying process, if line cleaning times are set, line cleaning ta- kes place. The line cleaning valves interrupt the flow of material and allow air to flow into the connecting pipe. In this way the connecting pipe is cleared of materi- al.

SM4-618

Functional description 6-2

Image 42
Contents Sterling Material Processing Parts and Service Department Technical service Edition 10/01Sgfe Table of contents Functional description Assembly instructionsTechnical data Spare parts list Accessories Electrical manualSafety instructions GeneralFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment Concerning these Operating Instructions General InformationConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Key assignment Switching on the control systemSetting the basic parameters Signal times flap B01Changes only after consultation with Sterling Service Setting the basic parameters Conveying time B05 Line clearing B09Emptying time B14 Setting the basic parameters Blower run on time B17 Error tolerance B22Starting the conveying procedure First conveying operationsViewing Alarm Messages Possible events Fault hopperSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system Adjusting the suction tube If conditions points 3 + 4 are not fulfilledIf the conditions points 3 + 4 are fulfilled Cleaning/replacing the filter cartridge RespServicing the accessories Assembly instructions Installation TransportMaterial feed Suction pipe Pipework Vacuum generator Installing the accessories Rotary lobe vacuum pump GDKElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GDK 4 kW Dimension sheet GSVDimension sheet GDS Spare parts list Pos ID-No Designation OptionalAccessories Electrical manual