PAS4•S | Writing conventions and symbols |
|
|
Writing conventions and symbols
Work steps If work steps must be performed consecutively, this sequence of steps is represented as follows:
Special prerequisites for the following work steps
Step 1
Specific response to this work step
Step 2
If a response to a work step is indicated, this allows you to verify that the work step has been performed correctly.
Unless otherwise stated, the individual steps must be performed in the specified sequence.
Bulleted lists The items in bulleted lists are sorted alphanumerically or by priority. Bul- leted lists are structured as follows:
•Item 1 of bulleted list
•Item 2 of bulleted list
–Subitem for 2
–Subitem for 2
•Item 3 of bulleted list
Making work easier Information on making work easier is highlighted by this symbol:
Sections highlighted this way provide supplementary information on making work easier.
SI units SI units are the original values. Converted units are shown in brackets behind the original value; they may be rounded.
Example:
Minimum conductor cross section: 1.5 mm2 (AWG 14)
MNA1MLSDM00EN, V2.01, 07.2009
Portal axes with ball screw drive | 7 |