Vermont Casting RADVTCCG, RADVTMB, RADVTSG, RADVTCB Pilot Orifice Conversion, Pilot Type 1 SIT Pilot

Page 37

2.Remove and replace plug on lower right hand side of the valve; Red for LP and Blue for NG. (Page 32, Fig. 57)

3.Remove motor top cap using a standard slotted screwdriver. Depress and turn center plunger until arrow points to correct screw. Red for LP and Blue for NG. NOTE: Plunger will “snap” into NG position when arrow is close to blue screw. It will not “snap” at LP (Red) position. (Fig. 66)

Radiance Direct Vent Gas Heater

Pilot Hood

Pilot

Bracket

CO105a

Center

Plunger

Blue - NGRed - LP

Motor Top Cap

Valve

LOCAL

FP1037b

Fig. 68 Remove pilot hood.

Index Tab

Allen Wrench

 

Snap Ring

 

Fig. 66 Depress and turn center plunger.

4.Insure manifold pressure remains between 3.2” - 3.5” w.c. for NG and 9.5” - 10” w.c. for LP. To adjust the manifold pressure, for NG, using a Torx #10 key turn the blue screw clockwise to increase the manifold pressure. Turn the screw counterclockwise to de- crease the pressure. Use the red screw to adjust LP.

5.Replace motor top cap.

Pilot Orifice Conversion

1. Locate pilot. (Fig. 67)

Pilot

ST916

Fig. 67 Locate pilot.

2.Replace pilot orifice.

Pilot Type 1 (SIT Pilot)

Remove pilot hood by lifting up. (Fig. 68) Do not remove the snap ring to remove the pilot hood. NOTE: It is not necessary to remove the pilot tube for conversion.

Remove pilot orifice with Allen wrench. (Fig. 69)

Install the conversion orifice.

Reinstall pilot hood. Be sure to align hood with index tab.

CO106a

Fig. 69 Remove pilot orifice.

Pilot type 2 (Honeywell Pilot)

Loosen pilot hood turning counterclockwise using a 7/16” wrench. (Fig. 70) NOTE: You may use pen- etrating oil to prevent pilot hood threads from seizing up.

Pilot Hood

Index

Marks

Pilot Bracket

CO143

Fig. 70 Remove pilot hood. (Your pilot may have a different appearance.)

Remove pilot orifice with needlenose pliers. (Fig. 71) NOTE: Use a wrench to hold pilot tube in place while removing the orifice.

Install the conversion orifice.

Reinstall pilot hood and tighten until mark on pilot hood aligns with mark on pilot bracket.

20012697

37

Image 37
Contents Radiance Direct Vent Gas Heater Table of Contents Commonwealth of Massachusetts Installation & Operating InstructionsCenterline Dimensions Radiance Direct Vent Stove DimensionsLocating The Stove Installation RequirementsClearance Requirements Direct Vent System OnlyCorner Installation Minimum Clearance and Flue Centerline Parallel Installation Minimum Clearance and Flue CenterlineWall Centerline from Floor Wall and Ceiling ClearancesGas Inlet and Manifold Pressures Gas SpecificationsHigh Elevations Horizontal TerminationRestictor Plate is used on Direct Vent installations only Restrictor Plate Adjustment For Extended Pipe RunsRestrictor Plate Adjustment Examples for Extended Run/Restrictor Plate SettingsLocation of Vent Termination Vent Termination ClearancesGeneral Venting Information Termination Location Canadian Installations1 US Installations2Termination Clearances Approved Vent System Components Venting Requirements and OptionsMinimum Horizontal Vent Kit 2792 12 18 Adjustable Pipe Twist Lock 24 Straight Pipe CG Non-adjustable Pipe Twist Lock 12 18 Adjustable PipeNon-adjustable Pipe Twist Lock 48 Straight Pipe CG Nonadjustable Pipe Twist Lock 45-Degree Elbow CGParts Bag Contents Assembly ProceduresTools Required Unpack and Assemble LegsRemove rear shroud Install the Optional FanInstall the Vent Adapter Pipe Venting System Assembly General InformationFor Canadian installations The venting system must Side Wall Termination Assembly Install Vent Adapter PipeSelkirk Corporation Vent Components Measure the horizontal length Vent Termination Below Grade Vertical Through the Roof Vent AssemblyCut the opening CFM System 9³⁄₈ x 9³⁄₈ 240 x 240 mmSelkirk Direct-Temp Metalbestos Direct Vent System Horizontal Venting Vertical VentingInlet End Outlet End To TerminationSupporting DIRECT-TEMP Horizontal Support Adjustable Length AJFire Stopping OffsetsBelow grade installation Vertical Installation Fig Minimum Height Above Roof Requirements Install Log Set2626 Burner Information Connect the Gas Supply LineOperation Flame Characteristics Flame & Temperature AdjustmentSIT Pilot Radvt Series Pilot Radvtc SeriesHoneywell To Turn Off Gas To HeaterSIT Nova 820 Millivolt Valve Troubleshooting the Gas Control System Radvt SeriesTransmitter Operation Off Mode Shut Off ProcedureOn Manual Mode Delay Timer ModeFan Override During Auto Mode Auto ModeChange Between F/C Temperature Units Disable Thermostat FunctionLocal Path On Path Auto Path Conversion Procedure Conversion PrecautionsFuel Conversion Instructions Pilot Type 1 SIT Pilot Pilot Orifice ConversionPilot type 2 Honeywell Pilot All Models Burner Orifice ConversionInjector Orifice Size Matrix Air Shutter AdjustmentHigh Altitude Orifice Conversion to LP Input BTU/hMaintenance Inspect the Vent System Annually Gasket ReplacementCheck the Gas Flame Regularly On/Off Switch Wiring Wiring DiagramsSchematic Diagram Optional ThermostatRadiance Direct Vent Gas Heater Description Radiance Direct Vent Gas HeaterFuel Conversion Kits Shell Enamel Parts Radiance Direct Vent Optional Accessories 4848 Radiance Direct Vent Gas Heater 5050 Limited Lifetime Warranty CFM Corporation