Install ON/OFF Switch

The switch assembly parts are found in the parts bag.

1.Attach switch assembly to left rear side of stove shroud (when facing shroud) using two screws and existing holes in shroud. (Fig. 52)

2.Run wires down back of stove, under bottom of rear shroud to valve.

3.Attach wires to valve terminals. (Fig. 53)

Switch As-

semblyExisting Holes

Screws

ST315

 

Fig. 52 Attach switch assembly to rear shroud.

TPTH TP TH

PILOT

ADJ

ST228

Fig. 53 Attach switch wires to valve.

Thermostat Connection (optional)

Use only a thermostat rated for 500 - 750 millivolts.

Check the table below for the appropriate gauge ther- mostat wire to use for the length of lead required in your installation.

Thermostat

 

Wire / Gauge

Maximum Run

18

20 feet

16

20 - 40 feet

14

up to 60 feet

1.Install the wall thermostat in the desired location and run the wires to the stove location. Terminate these leads with 1/4” female connectors.

2.Connect the thermostat wires to the valve. (Fig. 53)

Install the Mesh and Grille

Place the mesh and grille on the top of the Radiance stove to complete assembly.

Operation

�������

��������������

������������

������������������

�������������

��������������������

���������������

The Radiance is operated with the front plate in place with the doors open or closed. To open the front doors, pull forward to separate the magnetic catch.

Your First Fire

Read these instructions carefully and familiarize yourself with the burner controls shown on Page 29. Locate the pilot assembly, Figure 54. Follow the lighting instructions on Page 30 exactly.

During the first fire, it is not unusual to smell some odor associated with new logs, paint and metal being heated. Odors should dissipate within the first eight to ten hours, however, you can open a window to provide fresh air to alleviate the condition.

Pilot and Burner Inspection

CAUTION: DO NOT TOUCH DOORS WHEN HOT!

Each time you light your heater check that the pilot flame and burner flame patterns are as shown in Figure

56.If flame patterns are incorrect, turn the heater off. Contact your dealer or a qualified gas technician for as- sistance. Do not operate the heater until the pilot flame is correct.

2828

20012697

Image 28
Contents Radiance Direct Vent Gas Heater Table of Contents Installation & Operating Instructions Commonwealth of MassachusettsRadiance Direct Vent Stove Dimensions Centerline DimensionsInstallation Requirements Locating The StoveClearance Requirements Direct Vent System OnlyParallel Installation Minimum Clearance and Flue Centerline Corner Installation Minimum Clearance and Flue CenterlineWall Centerline from Floor Wall and Ceiling ClearancesGas Specifications Gas Inlet and Manifold PressuresHigh Elevations Horizontal TerminationRestrictor Plate Adjustment For Extended Pipe Runs Restictor Plate is used on Direct Vent installations onlyRestrictor Plate Adjustment Examples for Extended Run/Restrictor Plate SettingsVent Termination Clearances Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationTermination Clearances Approved Vent System Components Venting Requirements and OptionsMinimum Horizontal Vent Kit 2792 Non-adjustable Pipe Twist Lock 12 18 Adjustable Pipe 12 18 Adjustable Pipe Twist Lock 24 Straight Pipe CGNon-adjustable Pipe Twist Lock 48 Straight Pipe CG Nonadjustable Pipe Twist Lock 45-Degree Elbow CGAssembly Procedures Parts Bag ContentsTools Required Unpack and Assemble LegsInstall the Optional Fan Remove rear shroudInstall the Vent Adapter Pipe Venting System Assembly General InformationFor Canadian installations The venting system must Side Wall Termination Assembly Install Vent Adapter PipeSelkirk Corporation Vent Components Measure the horizontal length Vertical Through the Roof Vent Assembly Vent Termination Below GradeCut the opening CFM System 9³⁄₈ x 9³⁄₈ 240 x 240 mmSelkirk Direct-Temp Metalbestos Direct Vent System Vertical Venting Horizontal VentingInlet End Outlet End To TerminationAdjustable Length AJ Supporting DIRECT-TEMP Horizontal SupportFire Stopping OffsetsBelow grade installation Vertical Installation Fig Install Log Set Minimum Height Above Roof Requirements2626 Connect the Gas Supply Line Burner InformationOperation Flame & Temperature Adjustment Flame CharacteristicsSIT Pilot Radvt Series Pilot Radvtc SeriesTo Turn Off Gas To Heater HoneywellTroubleshooting the Gas Control System Radvt Series SIT Nova 820 Millivolt ValveShut Off Procedure Transmitter Operation Off ModeOn Manual Mode Delay Timer ModeAuto Mode Fan Override During Auto ModeChange Between F/C Temperature Units Disable Thermostat FunctionLocal Path On Path Auto Path Conversion Procedure Conversion PrecautionsFuel Conversion Instructions Pilot Type 1 SIT Pilot Pilot Orifice ConversionPilot type 2 Honeywell Pilot Burner Orifice Conversion All ModelsAir Shutter Adjustment Injector Orifice Size MatrixHigh Altitude Orifice Conversion to LP Input BTU/hMaintenance Inspect the Vent System Annually Gasket ReplacementCheck the Gas Flame Regularly Wiring Diagrams On/Off Switch WiringSchematic Diagram Optional ThermostatRadiance Direct Vent Gas Heater Radiance Direct Vent Gas Heater DescriptionFuel Conversion Kits Shell Enamel Parts Radiance Direct Vent Optional Accessories 4848 Radiance Direct Vent Gas Heater 5050 Limited Lifetime Warranty CFM Corporation