Vermont Casting RADVTCBD, RADVTMB, RADVTSG, RADVTCG Connect the Gas Supply Line, Burner Information

Page 27

Left Cross

Log

Figure 51

Front Left Log

Connect the Gas Supply Line

Check the Rating Plate attached by a steel cable to the firebox, to confirm that you have the appropriate firebox for the type of fuel to be used. The Radiance may be converted from one gas to another using the appropri- ate Fuel Conversion Kit listed on Page 45.

In the U.S.; Gas connection should be made in ac- cordance with current National Fuel Gas Code, ANSI Z223.1/NFPA 54. Since some municipalities have additional local codes, be sure to consult your local authority.

In Canada; consult the local authority and CSA-B149.1 installation code.

Always check for gas leaks with a mild soap and water solution. Do not use an open flame for leak testing.

Light the pilot according to the directions on Page 30, before going to the next step.

Burner Information

The appliance must only use the gas specified on the rating plate, unless converted using a Vermont Castings Fuel Conversion Kit. To convert from Natural Gas to LP use Kit 20012729 or 20012900. To convert from LP to Natural Gas use Kit 20012899 or 20012902.

Conversion instructions are provided with each kit and beginning on Page 36 in this manual.

Radiance Direct Vent Gas Heater

Rear Log

Right Cross Log

Front Right Log

LG490

Ember Bed

CAUTION

This appliance should only be connected by a qualified gas technician. Test to

confirm manifold pressures as specified below.

The Radiance Heater and its individual shutoff valve must be disconnected from the gas supply piping during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa).

The Radiance Heater must be isolated from the gas supply piping system by closing its indi- vidual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig.

There must be a gas shutoff between the stove and the supply.

In order to connect Natural Gas, use a fitting with 1/2” NPT on the valve side and 1/2” natural gas supply line with an input of 38,000 BTUs at a manifold pressure of 3.5” between minimum inlet supply of 5.5” w.c. and maximum of 14.0” w.c.

In order to connect Propane, use a fitting with 1/2” NPT on the valve side and 1/2” propane gas sup- ply line with an input of 36,000 BTUs at a manifold pressure of 10.0” between a minimum inlet supply of 11.0” w.c. and maximum of 14.0” w.c.

20012697

27

Image 27
Contents Radiance Direct Vent Gas Heater Table of Contents Commonwealth of Massachusetts Installation & Operating InstructionsCenterline Dimensions Radiance Direct Vent Stove DimensionsDirect Vent System Only Installation RequirementsLocating The Stove Clearance RequirementsWall and Ceiling Clearances Parallel Installation Minimum Clearance and Flue CenterlineCorner Installation Minimum Clearance and Flue Centerline Wall Centerline from FloorHorizontal Termination Gas SpecificationsGas Inlet and Manifold Pressures High ElevationsExamples for Extended Run/Restrictor Plate Settings Restrictor Plate Adjustment For Extended Pipe RunsRestictor Plate is used on Direct Vent installations only Restrictor Plate AdjustmentLocation of Vent Termination Vent Termination ClearancesGeneral Venting Information Termination Location Canadian Installations1 US Installations2Termination Clearances Venting Requirements and Options Approved Vent System ComponentsMinimum Horizontal Vent Kit 2792 Nonadjustable Pipe Twist Lock 45-Degree Elbow CG Non-adjustable Pipe Twist Lock 12 18 Adjustable Pipe12 18 Adjustable Pipe Twist Lock 24 Straight Pipe CG Non-adjustable Pipe Twist Lock 48 Straight Pipe CGUnpack and Assemble Legs Assembly ProceduresParts Bag Contents Tools RequiredRemove rear shroud Install the Optional FanVenting System Assembly General Information Install the Vent Adapter PipeFor Canadian installations The venting system must Install Vent Adapter Pipe Side Wall Termination AssemblySelkirk Corporation Vent Components Measure the horizontal length CFM System 9³⁄₈ x 9³⁄₈ 240 x 240 mm Vertical Through the Roof Vent AssemblyVent Termination Below Grade Cut the openingSelkirk Direct-Temp Metalbestos Direct Vent System To Termination Vertical VentingHorizontal Venting Inlet End Outlet EndOffsets Adjustable Length AJSupporting DIRECT-TEMP Horizontal Support Fire StoppingBelow grade installation Vertical Installation Fig Minimum Height Above Roof Requirements Install Log Set2626 Burner Information Connect the Gas Supply LineOperation Pilot Radvtc Series Flame & Temperature AdjustmentFlame Characteristics SIT Pilot Radvt SeriesHoneywell To Turn Off Gas To HeaterSIT Nova 820 Millivolt Valve Troubleshooting the Gas Control System Radvt SeriesDelay Timer Mode Shut Off ProcedureTransmitter Operation Off Mode On Manual ModeDisable Thermostat Function Auto ModeFan Override During Auto Mode Change Between F/C Temperature UnitsLocal Path On Path Auto Path Conversion Precautions Conversion ProcedureFuel Conversion Instructions Pilot Orifice Conversion Pilot Type 1 SIT PilotPilot type 2 Honeywell Pilot All Models Burner Orifice ConversionConversion to LP Input BTU/h Air Shutter AdjustmentInjector Orifice Size Matrix High Altitude OrificeMaintenance Gasket Replacement Inspect the Vent System AnnuallyCheck the Gas Flame Regularly Optional Thermostat Wiring DiagramsOn/Off Switch Wiring Schematic DiagramRadiance Direct Vent Gas Heater Description Radiance Direct Vent Gas HeaterFuel Conversion Kits Shell Enamel Parts Radiance Direct Vent Optional Accessories 4848 Radiance Direct Vent Gas Heater 5050 Limited Lifetime Warranty CFM Corporation