| |
|
|
REASSEMBL Y PROCEDURE | 4. ER·tube |
|
|
4. ER·tube |
|
1 | |
t.:p | _+_ |
l)lnsert lenses @ and i@ into mount (D (to be positioned as r;aJ- thicker) and
(";"\ | Down t |
ftx them with retaining ring\_:J.
2)FLx prism @ to G) with plastic screw (~). transitorily, in such a position, as shown in Fig. 29, that the end surfaces are coincided.
1?
Coincide tltis cd~cs.
Fig. 29
J)lnsert lenses @ and @ (to be positioned as GiE@T_l_ thicker) into lens chamber(D,
Down
and ftx them with retaining ring@.
4)Attach (D to G) with screws @ x 2 at the center of the hole in (D.
5)Attach(D to G)with screws @xJ.
l ·2. Reassembly is the sarne as mentioned for the binocular body of
- 33 -