Optipay™ CC
A-66 Coin Changer
S e c t i o n 5
5 INSTALLATION
This section provides a installation instructions for the Optipay™ CC
•Energized within a Vending Machine, or
•Connected to a JCM Test Station using WinMDB© software for test purposes or
•Connected to one of the following JCM configuration tools for set up purposes:
–A PC programming station containing WinEMP© software
–A Palm Pilot® handheld (containing
installed PalmA66® and/or PalmEMP® software).
This section describes how to connect the Coin Changer to a Vending Machine. For details on con- necting the service tools, see section 11 "Config- uration".
To avoid damage to the equipment, please make sure that you check the following before installation:
–check that the Coin Changer’s MDB connecting cable is suitable for the Vending Machine interface.
–check that the Coin Changer’s power supply is the same as the nominal voltage stated on its product label.
The following steps describe how to install the Coin Changer into a Vending Machine:
1.Disconnect the Vending Machine’s main AC power plug.
2.Unlock (See Figure
3.Hang the
Figure 5-1 Coin Validator Removal
Upper Mounting Holes
3 | Pull | Lift up | ||
| Out |
|
| 1 |
| 2 |
|
| |
|
|
|
|
4 Another hole
at bottom
Figure 5-2 Coin Changer mounting hole locations
located at the top (See Figure
Ensure that the Coin Validator assembly remains safely connected to the Coin Changer by the flat
4.Tightly secure the Coin Changer's housing to the Vending Machine.
5.Replace the Coin Validator back into the Coin Changer and engage.
Ensure that an air space exists between the Vending Machine’s return lever and that of the Coin Changer when closing.
5900335 © 2005
5 - 1