C. Crane A-66 manual Cleaning, 1Opening and Closing the Coin Validator’s Access Panel

Page 29

OptipayCC

A-66 Coin Changer

S e c t i o n 8

8 CLEANING

This section explains how to clean the Optipay™ CC A-66 Coin Changer.

Only wipe the Coin Validator from time to time with a damp cloth (use luke warm water containing a mild dish cleaning liquid):

Under no circumstances allow the cloth to be wet enough to allow excess fluid to run into the device. Otherwise the printed circuit board (pcb) may be damaged.

Do not use any solvents or scouring agents which can attack the plastic surfaces of the device.

1.Remove the Vending Machine’s main AC power plug.

2.Press up on the locking catch lever and open the Coin Validator panel to the left

(See Figure 8-1 [1]).

3.Wipe the coin runway clean once inside the coin validation area.

4.Close the Coin Validator panel and gently press in on the "Close" arrow white dot until the metal spring engages behind the lever and a click is heard (See Figure 8-1 [2]).

5.Reconnect the Vending Machine to the main AC power supply.

Figure 8-1Opening and Closing the Coin Validator’s Access Panel

5900335 © 2005 JCM-American Corporation

8 - 1

Image 29
Contents OptipayTM CC Page Optipay CC Cleaning Transport Technical Data LOF List of FiguresThis page Intentionally Left Blank LOT List of TablesOptipay CC List of Tables General Information General InformationGeneral Information Concerning Coin Changer Service ToolsAdvantages PC Test StationUpdate Tools Configuration ToolsOptipay CC Proper use Safety InstructionsProtecting Yourself and the Equip- ment This page Intentionally Left Blank Device Overview DesignCoin Validator Return Lever DIP Switch BlockKeyboard Pilot LightsTube Cassette Payout UnitProduct Labels Filling Level Sensors MDB Vending Machine CablePayout Module Functions Configuring Change Tube Coin MaximumResetting the Tube Counter Configuring TokensSecurity Stock Considerations Inhibiting Certain Coin TypesMinimizing String Manipulation optional Individual Wake-up Time Consider- ationsThis page Intentionally Left Blank 1Coin Validator Removal InstallationInstallation 1Coin Validator Keyboard EnergizingThis page Intentionally Left Blank Validator Change Filling OperationEmptying the Change Tubes to a Certain Fill Level 2Coin Validator Switch Block Inhibiting Coin Types Using DIP Switch Block Settings1Opening and Closing the Coin Validator’s Access Panel CleaningThis page Intentionally Left Blank Transport This page Intentionally Left Blank CE Certification Technical DataSpecifications This page Intentionally Left Blank Workshop Testing the Coin Changer ConfigurationWorkshop Testing and/or Configur- ing the Coin Changer PC Programming Station and Palm Pilot Handheld UseWinEMP Software Which Functions Can be Config- ured?PalmA66 Software PalmEMP Software1PC Programming Station Connection Connecting a Palm Pilot HandheldThis page Intentionally Left Blank Requirements Managing Coin and Configuration Set- tingsSet functions listed in -5 a through h Enabling the Bill Recycler Select Tab on Changer Service, Token Programming, and Currency Conversion Gramming within the menu 18Conversion Setting Mode Changer DiagnosticsDisclaimer IndexLED PalmE66 Numerics Testing requirements conditions for…Quick Pilot Light Diagnosis Trouble ShootingFront Panel LED Indicators Display Meaning Trouble Diagnosis Using a Palm Pilot Set- ting ModuleDisplay Meaning Trouble Optipay CC Trouble Shooting Glossary Coin ChangerGlossary of Terms Optipay CC Glossary May 5900335