Bard I42H1D, I36H1D, I60H1D, I48H1D, I30H1D Ducted Application Basic Unit

Page 14

Page

Manual

14 of

2100

59

-549G

 

 

 

FIELD SUPPLIED DUCT

BOTTOM OF ROOF

TURNING VANES

OR FIXED CEILING

RECOMMENDED

 

SUSPENDED

20"

12"

CEILING

MINIMUM

MINIMUM

 

 

4" MINIMUM FROM

 

 

TOP OF UNIT TO

 

 

DUCT BOTTOM

 

9'-7" MINIMUM

 

 

CLEARANCE

9'-2"

7'-9 3/4"

RECOMMENDED TO

MINIMUM

BOTTOM OF ROOF

REQUIRED

UNIT HEIGHT

OR FIXED CEILING

INSTALLATION

 

 

 

HEIGHT

FLOOR

MIS-2958 B

DUCTED APPLICATION –

FIGURE 7A

BASIC UNIT

 

Image 14
Contents TEC Series Packaged Heat Pump Contents Getting Other Information and Publications For More INFORMATION, Contact These PublishersGeneral Ansi Z535.5 DefinitionsFactory BUILT-IN Electric Heat Table Indoor Blower PerformanceElectrical Specifications Unit Specification Sheet Unit DimensionsHandling Unit After Removal from Skid Shipping DamageUnit Removal from Skid Wall Mounting Bracket Location Minimum Installation HeightSeismic Considerations Bracket Wall Section View Center of Gravity Center of GravityRequired Clearances & Recommended Access Compressor Shipping Bolts Removal of AIR DuctDucted Application Basic Unit 3 Riser Application 6 Riser Application Supply Duct Connections Duct WorkFilters Filter LocationWith no Vent Option With Energy Recovery VentilatorCondensate Drain With Commercial Room VentilatorUnit Mounting 16 3/4 NON-TAPPING 16 1/2 NON-TAPPINGTEC Unit Component Location Wiring Main PowerMounting the Unit Operating Voltage Range Wiring LOW Voltage WiringLOW Voltage Connections Wall ThermostatsBasic Heat Pump with no Ventilation Package SC SC SCY2 B/W1 W2 W3 CRV Wiring Harness Heat Pump with CRV, Without CO2 ControlHeat Pump with CRV and CO2 Control To functionERV Wiring Harness Heat Pump with ERV, Without CO2 ControlHeat Pump with ERV and CO2 Control ON/OFF Cycling ERV Wiring Harness Bard #8403-067 Heat Pump with ERV and CO2 Control Fully ModulatingHeat Pump with Combination CRV and DB Economizer N Vent Code Safety Practices Topping OFF System ChargeThree Phase Scroll Compressor Start UP Information Important Installer NotePhase Monitor Service HintsSound Pressure Service PortsSequence of Operation Defrost Cycle Defrost CycleTeccommercial Room Ventilator System General Description Control WiringSetting the Ventilation CFM Levels Recommended Control SequencesCRV Motor SPEED/CFM Configuration Vent Option INTAKE/EXHAUST SpeedsCRV Speed Change Terminal Access Control Wiring TECECON. Sequence of Operation Economizer Control CircuitMotor SPEED/CFM Configuration Heating Mode OperationVentilation Mode Tecenergy Recovery Ventilator System General Description Changing Ventilation CFM Rates in Manual Mode Changing to Fully Modulating ModePerformance and Application Data Winter Heating Performance Indoor Design Conditions 70F DBERV Manual Mode Jumper PIN on M Terminal ERV Modulating Mode Jumper PIN on P TerminalVentilation Airflow Diagram Indoor Air Supply Air Outdoor AirERV Access Specifications Control Board CONFIGURATION/SETTINGMounting WiringAccessing Menu Parameters Selection of Voltage OutputsMenu Descriptions Maintenance Procedures Quarterly Maintenance Energy Recovery Ventilator Maintenance General InformationCleanability and Performance FrequencyAnnual Maintenance Codes Function Solid State Heat Pump Control Troubleshooting ProcedureTroubleshooting Checking Temperature Sensor Temperature F VS Resistance R of Temperature SensorTroubleshooting ECM 142R Outdoor FAN Motor Heat Pump Mode Troubleshooting ECM 142R Outdoor FAN MotorCooling Mode Replacing the MotorTroubleshooting Indoor ECM Blower Motors Troubleshooting Indoor ECM Blower Motors Cont’d Power Connector Motor Half FAN Blade Setting DimensionsControl Connector Motor Half Refrigerant ChargeFull Load Cooling PRESSURE/TEMPERATURE Full Load Heating PRESSURE/TEMPERATUREPart Load Cooling PRESSURE/TEMPERATURE Part Load Heating PRESSURE/TEMPERATURE