BOTTOM OF ROOF

FIELD SUPPLIED DUCT

TURNING VANES

OR FIXED CEILING

 

 

RECOMMENDED

 

 

SUSPENDED

20"

12"

CEILING

MINIMUM

MINIMUM

 

 

4" MINIMUM FROM

 

 

TOP OF UNIT TO

 

 

DUCT BOTTOM

 

9'-10" MINIMUM

9'-5"

7'-9 3/4"

CLEARANCE

MINIMUM

RECOMMENDED TO

REQUIRED

UNIT HEIGHT

BOTTOM OF ROOF

INSTALLATION

 

 

OR FIXED CEILING

HEIGHT

FLOOR

3" RISER

MIS-2989 B

FIGURE 7B 3" RISER APPLICATION

Image 15
Contents TEC Series Packaged Heat Pump Contents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsAnsi Z535.5 Definitions GeneralIndoor Blower Performance Factory BUILT-IN Electric Heat TableElectrical Specifications Unit Dimensions Unit Specification SheetShipping Damage Unit Removal from SkidHandling Unit After Removal from Skid Minimum Installation Height Seismic ConsiderationsWall Mounting Bracket Location Bracket Wall Section View Center of Gravity Center of GravityRequired Clearances & Recommended Access Removal of AIR Duct Compressor Shipping BoltsDucted Application Basic Unit 3 Riser Application 6 Riser Application Filter Location Duct WorkFilters Supply Duct ConnectionsWith Commercial Room Ventilator With Energy Recovery VentilatorCondensate Drain With no Vent Option16 3/4 NON-TAPPING 16 1/2 NON-TAPPING Unit MountingTEC Unit Wiring Main Power Mounting the UnitComponent Location Wall Thermostats Wiring LOW Voltage WiringLOW Voltage Connections Operating Voltage RangeSC SC SC Basic Heat Pump with no Ventilation PackageHeat Pump with CRV, Without CO2 Control Y2 B/W1 W2 W3 CRV Wiring HarnessTo function Heat Pump with CRV and CO2 ControlHeat Pump with ERV, Without CO2 Control ERV Wiring HarnessHeat Pump with ERV and CO2 Control ON/OFF Cycling Heat Pump with ERV and CO2 Control Fully Modulating ERV Wiring Harness Bard #8403-067Heat Pump with Combination CRV and DB Economizer N Vent Code Topping OFF System Charge Safety PracticesService Hints Important Installer NotePhase Monitor Three Phase Scroll Compressor Start UP InformationPressure Service Ports Sequence of OperationSound Defrost Cycle Defrost CycleRecommended Control Sequences Control WiringSetting the Ventilation CFM Levels Teccommercial Room Ventilator System General DescriptionVent Option INTAKE/EXHAUST Speeds CRV Motor SPEED/CFM ConfigurationCRV Speed Change Terminal Access Control Wiring Economizer Control Circuit TECECON. Sequence of OperationHeating Mode Operation Ventilation ModeMotor SPEED/CFM Configuration Tecenergy Recovery Ventilator System General Description Changing to Fully Modulating Mode Changing Ventilation CFM Rates in Manual ModeWinter Heating Performance Indoor Design Conditions 70F DB Performance and Application DataERV Modulating Mode Jumper PIN on P Terminal ERV Manual Mode Jumper PIN on M TerminalIndoor Air Supply Air Outdoor Air Ventilation Airflow DiagramERV Access Control Board CONFIGURATION/SETTING SpecificationsSelection of Voltage Outputs WiringAccessing Menu Parameters MountingMenu Descriptions Frequency Energy Recovery Ventilator Maintenance General InformationCleanability and Performance Maintenance Procedures Quarterly MaintenanceAnnual Maintenance Solid State Heat Pump Control Troubleshooting Procedure TroubleshootingCodes Function Temperature F VS Resistance R of Temperature Sensor Checking Temperature SensorTroubleshooting ECM 142R Outdoor FAN Motor Replacing the Motor Troubleshooting ECM 142R Outdoor FAN MotorCooling Mode Heat Pump ModeTroubleshooting Indoor ECM Blower Motors Troubleshooting Indoor ECM Blower Motors Cont’d Refrigerant Charge FAN Blade Setting DimensionsControl Connector Motor Half Power Connector Motor HalfFull Load Heating PRESSURE/TEMPERATURE Full Load Cooling PRESSURE/TEMPERATUREPart Load Heating PRESSURE/TEMPERATURE Part Load Cooling PRESSURE/TEMPERATURE