Bard I36H1 ERV Manual Mode Jumper PIN on M Terminal, ERV Modulating Mode Jumper PIN on P Terminal

Page 43

FIGURE 25A

ERV “MANUAL MODE” JUMPER PIN ON “M” TERMINAL

 

 

To adjust the airflow ventilation rate (NO CO2

 

FLOW INDEX (Light

CONTROL/NON-MODULATING) , determine the "FLOW

ERV CFM

Blink Code)

INDEX" needed for the intake and exhaust blowers for

 

 

450

100

the CFM you require.

 

 

 

 

425

89

1.> Locate two 0-10Vdc Motor Control Boards in control panel

400

83

 

375

76

2.> On intake Motor Control Board, observing "GREEN STATUS

350

59

LIGHT", turn manual adjust potentiometer (with a small phillips-head

screwdriver) "CCW" to increase "FLOW INDEX" or CW to reduce

325

50

"FLOW INDEX" to match desired setting. (NOTE: After long pause,

the green status light will blink long-blinks for the "TEN COUNT" of

 

 

300

40

the "FLOW RATE INDEX", which then is immediately followed by

275

32

fast blinks which indicate the second digit. For example, a Flow

Index of 23 would be two long blinks, followed by 3 fast blinks of

 

 

the "GREEN STATUS LIGHT".)

250

25

 

225

12

3.> On exhaust Motor Control Board, observing "GREEN STATUS

200

9

LIGHT", turn manual adjust potentiometer (with a small phillips-head

screwdriver) "CCW" to increase "FLOW INDEX" or CW to reduce

 

 

175

4

"FLOW INDEX" to match desired setting. (Same GREEN STATUS

150

1

LIGHT blink (refer to Step #5))

 

 

 

 

FIGURE 25B

ERV “MODULATING MODE” JUMPER PIN ON “P” TERMINAL

 

Vdc Signal

 

CFM

from CO2

 

 

Control

 

450

10

 

 

 

 

425

8.87

 

400

8.31

 

375

7.61

After determining the air volume

rates needed for the intended

350

6.73

application (Maximum &

325

5.91

Minimum), the table

immediately to the left will allow

300

5.15

for you to program your CO2

275

4.58

control output voltages in

 

250

4.06

correlation to the CO2 levels you

wish to control when Bard Part #

225

2.91

8403-067 CO2 Control is applied.

200

2.57

 

175

2.24

 

150

1.74

 

 

 

 

125

0.96

 

100

0.77

 

 

 

 

Manual

2100-549G

Page

43 of 59

Image 43
Contents TEC Series Packaged Heat Pump Contents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsAnsi Z535.5 Definitions GeneralIndoor Blower Performance Factory BUILT-IN Electric Heat TableElectrical Specifications Unit Dimensions Unit Specification SheetUnit Removal from Skid Shipping DamageHandling Unit After Removal from Skid Seismic Considerations Minimum Installation HeightWall Mounting Bracket Location Bracket Wall Section View Center of Gravity Center of GravityRequired Clearances & Recommended Access Removal of AIR Duct Compressor Shipping BoltsDucted Application Basic Unit 3 Riser Application 6 Riser Application Filter Location Duct WorkFilters Supply Duct ConnectionsWith Commercial Room Ventilator With Energy Recovery VentilatorCondensate Drain With no Vent Option16 3/4 NON-TAPPING 16 1/2 NON-TAPPING Unit MountingTEC Unit Mounting the Unit Wiring Main PowerComponent Location Wall Thermostats Wiring LOW Voltage WiringLOW Voltage Connections Operating Voltage RangeSC SC SC Basic Heat Pump with no Ventilation PackageHeat Pump with CRV, Without CO2 Control Y2 B/W1 W2 W3 CRV Wiring HarnessTo function Heat Pump with CRV and CO2 ControlHeat Pump with ERV, Without CO2 Control ERV Wiring HarnessHeat Pump with ERV and CO2 Control ON/OFF Cycling Heat Pump with ERV and CO2 Control Fully Modulating ERV Wiring Harness Bard #8403-067Heat Pump with Combination CRV and DB Economizer N Vent Code Topping OFF System Charge Safety PracticesService Hints Important Installer NotePhase Monitor Three Phase Scroll Compressor Start UP InformationSequence of Operation Pressure Service PortsSound Defrost Cycle Defrost CycleRecommended Control Sequences Control WiringSetting the Ventilation CFM Levels Teccommercial Room Ventilator System General DescriptionVent Option INTAKE/EXHAUST Speeds CRV Motor SPEED/CFM ConfigurationCRV Speed Change Terminal Access Control Wiring Economizer Control Circuit TECECON. Sequence of OperationVentilation Mode Heating Mode OperationMotor SPEED/CFM Configuration Tecenergy Recovery Ventilator System General Description Changing to Fully Modulating Mode Changing Ventilation CFM Rates in Manual ModeWinter Heating Performance Indoor Design Conditions 70F DB Performance and Application DataERV Modulating Mode Jumper PIN on P Terminal ERV Manual Mode Jumper PIN on M TerminalIndoor Air Supply Air Outdoor Air Ventilation Airflow DiagramERV Access Control Board CONFIGURATION/SETTING SpecificationsSelection of Voltage Outputs WiringAccessing Menu Parameters MountingMenu Descriptions Frequency Energy Recovery Ventilator Maintenance General InformationCleanability and Performance Maintenance Procedures Quarterly MaintenanceAnnual Maintenance Troubleshooting Solid State Heat Pump Control Troubleshooting ProcedureCodes Function Temperature F VS Resistance R of Temperature Sensor Checking Temperature SensorTroubleshooting ECM 142R Outdoor FAN Motor Replacing the Motor Troubleshooting ECM 142R Outdoor FAN MotorCooling Mode Heat Pump ModeTroubleshooting Indoor ECM Blower Motors Troubleshooting Indoor ECM Blower Motors Cont’d Refrigerant Charge FAN Blade Setting DimensionsControl Connector Motor Half Power Connector Motor HalfFull Load Heating PRESSURE/TEMPERATURE Full Load Cooling PRESSURE/TEMPERATUREPart Load Heating PRESSURE/TEMPERATURE Part Load Cooling PRESSURE/TEMPERATURE