Bard I48H1, I60H1, I42H1D, I36H1D Heat Pump with Combination CRV and DB Economizer N Vent Code

Page 29

FIGURE 19

HEAT PUMP WITH COMBINATION CRV AND DB ECONOMIZER (“N” VENT CODE)

Only Recommend Bard CS9B-THOC or CS9BE-THOC as Require 3 Heating/Cooling Stages

Completestat

SC SC SC

Model #CS9B-THOC or

Model #CS9BE-THOC

 

 

24V

COM

G

Y0

Y1

Y2

O/B

W2

W1/E

L

A

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

Low

R

RT

C

G

6

7

8

B/W1

W2

W3

L

A

D

Y1

Y2

Voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Term. Strip

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RED/WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLACK/WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ORANGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GRAY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YELLOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PURPLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BROWN/WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PURPLE/WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YELLOW/BLACK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLUE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CRV/ECON Wiring Harness

1Factory installed jumper. Remove jumper and connect to N.C fire alarm circuit if emergency shutdown required.

2Not needed below 15KW.

3Additional wire required for dehumidification models.

4 Connect orange wire to "G" terminal

MIS-3270

Manual

2100-549G

Page

29 of 59

Image 29
Contents TEC Series Packaged Heat Pump Contents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsAnsi Z535.5 Definitions GeneralIndoor Blower Performance Factory BUILT-IN Electric Heat TableElectrical Specifications Unit Dimensions Unit Specification SheetHandling Unit After Removal from Skid Shipping DamageUnit Removal from Skid Wall Mounting Bracket Location Minimum Installation HeightSeismic Considerations Bracket Wall Section View Center of Gravity Center of GravityRequired Clearances & Recommended Access Removal of AIR Duct Compressor Shipping BoltsDucted Application Basic Unit 3 Riser Application 6 Riser Application Filters Duct WorkSupply Duct Connections Filter LocationCondensate Drain With Energy Recovery VentilatorWith no Vent Option With Commercial Room Ventilator16 3/4 NON-TAPPING 16 1/2 NON-TAPPING Unit MountingTEC Unit Component Location Wiring Main PowerMounting the Unit LOW Voltage Connections Wiring LOW Voltage WiringOperating Voltage Range Wall ThermostatsSC SC SC Basic Heat Pump with no Ventilation PackageHeat Pump with CRV, Without CO2 Control Y2 B/W1 W2 W3 CRV Wiring HarnessTo function Heat Pump with CRV and CO2 ControlHeat Pump with ERV, Without CO2 Control ERV Wiring HarnessHeat Pump with ERV and CO2 Control ON/OFF Cycling Heat Pump with ERV and CO2 Control Fully Modulating ERV Wiring Harness Bard #8403-067Heat Pump with Combination CRV and DB Economizer N Vent Code Topping OFF System Charge Safety PracticesPhase Monitor Important Installer NoteThree Phase Scroll Compressor Start UP Information Service HintsSound Pressure Service PortsSequence of Operation Defrost Cycle Defrost CycleSetting the Ventilation CFM Levels Control WiringTeccommercial Room Ventilator System General Description Recommended Control SequencesVent Option INTAKE/EXHAUST Speeds CRV Motor SPEED/CFM ConfigurationCRV Speed Change Terminal Access Control Wiring Economizer Control Circuit TECECON. Sequence of OperationMotor SPEED/CFM Configuration Heating Mode OperationVentilation Mode Tecenergy Recovery Ventilator System General Description Changing to Fully Modulating Mode Changing Ventilation CFM Rates in Manual ModeWinter Heating Performance Indoor Design Conditions 70F DB Performance and Application DataERV Modulating Mode Jumper PIN on P Terminal ERV Manual Mode Jumper PIN on M TerminalIndoor Air Supply Air Outdoor Air Ventilation Airflow DiagramERV Access Control Board CONFIGURATION/SETTING SpecificationsAccessing Menu Parameters WiringMounting Selection of Voltage OutputsMenu Descriptions Cleanability and Performance Energy Recovery Ventilator Maintenance General InformationMaintenance Procedures Quarterly Maintenance FrequencyAnnual Maintenance Codes Function Solid State Heat Pump Control Troubleshooting ProcedureTroubleshooting Temperature F VS Resistance R of Temperature Sensor Checking Temperature SensorTroubleshooting ECM 142R Outdoor FAN Motor Cooling Mode Troubleshooting ECM 142R Outdoor FAN MotorHeat Pump Mode Replacing the MotorTroubleshooting Indoor ECM Blower Motors Troubleshooting Indoor ECM Blower Motors Cont’d Control Connector Motor Half FAN Blade Setting DimensionsPower Connector Motor Half Refrigerant ChargeFull Load Heating PRESSURE/TEMPERATURE Full Load Cooling PRESSURE/TEMPERATUREPart Load Heating PRESSURE/TEMPERATURE Part Load Cooling PRESSURE/TEMPERATURE