Bard I30H1, I60H1, I42H1D CRV Motor SPEED/CFM Configuration, Vent Option INTAKE/EXHAUST Speeds

Page 35

FIGURE 21

CRV MOTOR SPEED/CFM CONFIGURATION

VENT OPTION INTAKE/EXHAUST SPEEDS

WIRE COLOR

SPEED

NOM. CFM

 

 

 

BLACK

HI

525

BLUE

MED-HI

450

ORANGE

MED-LO

375

RED

LO

300

TO CHANGE SPEEDS, MOVE BROWN

WIRE WITH WHITE TRACE.

7961-755-2

BROWN/WHITE

Move brown/white wire to corresponding motor speed for required ventilation CFM. Factory setting is Medium Lo (375 CFM).

HI

SPEEDS

MED. HI

MOTOR

MED. LO

 

LO

7961-7554

BLACK

BLUE

ORANGE

RED

MIS-3022 A

Manual

2100-549G

Page

35 of 59

Image 35
Contents TEC Series Packaged Heat Pump Contents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsAnsi Z535.5 Definitions GeneralIndoor Blower Performance Factory BUILT-IN Electric Heat TableElectrical Specifications Unit Dimensions Unit Specification SheetHandling Unit After Removal from Skid Shipping DamageUnit Removal from Skid Wall Mounting Bracket Location Minimum Installation HeightSeismic Considerations Bracket Wall Section View Center of Gravity Center of GravityRequired Clearances & Recommended Access Removal of AIR Duct Compressor Shipping BoltsDucted Application Basic Unit 3 Riser Application 6 Riser Application Filter Location Duct WorkFilters Supply Duct ConnectionsWith Commercial Room Ventilator With Energy Recovery VentilatorCondensate Drain With no Vent Option16 3/4 NON-TAPPING 16 1/2 NON-TAPPING Unit MountingTEC Unit Component Location Wiring Main PowerMounting the Unit Wall Thermostats Wiring LOW Voltage WiringLOW Voltage Connections Operating Voltage RangeSC SC SC Basic Heat Pump with no Ventilation PackageHeat Pump with CRV, Without CO2 Control Y2 B/W1 W2 W3 CRV Wiring HarnessTo function Heat Pump with CRV and CO2 ControlHeat Pump with ERV, Without CO2 Control ERV Wiring HarnessHeat Pump with ERV and CO2 Control ON/OFF Cycling Heat Pump with ERV and CO2 Control Fully Modulating ERV Wiring Harness Bard #8403-067Heat Pump with Combination CRV and DB Economizer N Vent Code Topping OFF System Charge Safety PracticesService Hints Important Installer NotePhase Monitor Three Phase Scroll Compressor Start UP InformationSound Pressure Service PortsSequence of Operation Defrost Cycle Defrost CycleRecommended Control Sequences Control WiringSetting the Ventilation CFM Levels Teccommercial Room Ventilator System General DescriptionVent Option INTAKE/EXHAUST Speeds CRV Motor SPEED/CFM ConfigurationCRV Speed Change Terminal Access Control Wiring Economizer Control Circuit TECECON. Sequence of OperationMotor SPEED/CFM Configuration Heating Mode OperationVentilation Mode Tecenergy Recovery Ventilator System General Description Changing to Fully Modulating Mode Changing Ventilation CFM Rates in Manual ModeWinter Heating Performance Indoor Design Conditions 70F DB Performance and Application DataERV Modulating Mode Jumper PIN on P Terminal ERV Manual Mode Jumper PIN on M TerminalIndoor Air Supply Air Outdoor Air Ventilation Airflow DiagramERV Access Control Board CONFIGURATION/SETTING SpecificationsSelection of Voltage Outputs WiringAccessing Menu Parameters MountingMenu Descriptions Frequency Energy Recovery Ventilator Maintenance General InformationCleanability and Performance Maintenance Procedures Quarterly MaintenanceAnnual Maintenance Codes Function Solid State Heat Pump Control Troubleshooting ProcedureTroubleshooting Temperature F VS Resistance R of Temperature Sensor Checking Temperature SensorTroubleshooting ECM 142R Outdoor FAN Motor Replacing the Motor Troubleshooting ECM 142R Outdoor FAN MotorCooling Mode Heat Pump ModeTroubleshooting Indoor ECM Blower Motors Troubleshooting Indoor ECM Blower Motors Cont’d Refrigerant Charge FAN Blade Setting DimensionsControl Connector Motor Half Power Connector Motor HalfFull Load Heating PRESSURE/TEMPERATURE Full Load Cooling PRESSURE/TEMPERATUREPart Load Heating PRESSURE/TEMPERATURE Part Load Cooling PRESSURE/TEMPERATURE