Bard I48H1D, I60H1, I42H1D Mounting, Wiring, Selection of Voltage Outputs, Editing Menu Parameters

Page 47

CONFIGURING BARD PART #8403-067 CO2 CONTROL for ERV MODULATING CONTROL (Continued)

MOUNTING

1.Push tab on bottom of cover and lift cover from back plate.

2.Select the mounting location, away from diffusers, lights or any external influences.

3.Mount transmitter on a vertical surface to a standard electrical box using the two #6 M2C type screws provided.

4.Pull wires through sub base hole and make necessary connections.

5.Reattach cover to base plate.

WIRING

Use maximum 18 AWG wire for wiring to terminals. Refer to Figures 13-19 for wiring information.

SELECTION OF VOLTAGE OUTPUTS

Prior to wiring, verify the voltage selector jumpers on jumpers PJ1 and PJ2 are set to voltage (See Figure below).

CURRENT/VOLTAGE OUTPUT

SELECTION JUMPER (PJ1 & PJ2)

VOLTAGE

OUTPUT

CV

Next, move jumper PJ5 to the 0-10V range (See Figure below).

OUTPUT RANGE SELECTION JUMPER PJ5

0 to 10 V

0 to 20 mA

EDITING MENU PARAMETERS

Before any adjustment can be made to the transmitter, the Menu Lockout Jumper (PJ4) must be set to the “On” position (See Figure below).

MENU LOCKOUT JUMPER

ENABLED DISABLED

MENU MENU

PJ4

PJ4

ON OFF

ON OFF

Finish installing/wiring the control. Then, refer to Figure 20 and the building ventilation specifications to decide what the maximum ventilation rate desired is and what the minimum/maximum voltage signal is required for those levels.

Next, enter the control programming stage listed below once the system is powered-up to configure the control.

ACCESSING MENU PARAMETERS

Step 1: To enter the menu structure, press U and

Vsimultaneously for 5 seconds (display will show RON parameter).

Step 2: Press

U or

V to cycle between

menu items.

 

Step 3: Press

to edit the value for the

displayed menu item (SET will appear on

display).

 

Step 4: Press

U or

V to adjust the value of

the menu item.

 

Step 5: Press

to save the changes (SET will

disappear).

Step 6: Repeat Steps 2 through 5 for each of the parameters.

Step 7: To exit the menu at any time, press and hold

Uand V simultaneously for 5 seconds or wait 10 seconds without pushing any buttons.

Manual

2100-549G

Page

47 of 59

Image 47
Contents TEC Series Packaged Heat Pump Contents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsAnsi Z535.5 Definitions GeneralIndoor Blower Performance Factory BUILT-IN Electric Heat TableElectrical Specifications Unit Dimensions Unit Specification SheetHandling Unit After Removal from Skid Shipping DamageUnit Removal from Skid Wall Mounting Bracket Location Minimum Installation HeightSeismic Considerations Bracket Wall Section View Center of Gravity Center of GravityRequired Clearances & Recommended Access Removal of AIR Duct Compressor Shipping BoltsDucted Application Basic Unit 3 Riser Application 6 Riser Application Filter Location Duct WorkFilters Supply Duct ConnectionsWith Commercial Room Ventilator With Energy Recovery VentilatorCondensate Drain With no Vent Option16 3/4 NON-TAPPING 16 1/2 NON-TAPPING Unit MountingTEC Unit Component Location Wiring Main PowerMounting the Unit Wall Thermostats Wiring LOW Voltage WiringLOW Voltage Connections Operating Voltage RangeSC SC SC Basic Heat Pump with no Ventilation PackageHeat Pump with CRV, Without CO2 Control Y2 B/W1 W2 W3 CRV Wiring HarnessTo function Heat Pump with CRV and CO2 ControlHeat Pump with ERV, Without CO2 Control ERV Wiring HarnessHeat Pump with ERV and CO2 Control ON/OFF Cycling Heat Pump with ERV and CO2 Control Fully Modulating ERV Wiring Harness Bard #8403-067Heat Pump with Combination CRV and DB Economizer N Vent Code Topping OFF System Charge Safety PracticesService Hints Important Installer NotePhase Monitor Three Phase Scroll Compressor Start UP InformationSound Pressure Service PortsSequence of Operation Defrost Cycle Defrost CycleRecommended Control Sequences Control WiringSetting the Ventilation CFM Levels Teccommercial Room Ventilator System General DescriptionVent Option INTAKE/EXHAUST Speeds CRV Motor SPEED/CFM ConfigurationCRV Speed Change Terminal Access Control Wiring Economizer Control Circuit TECECON. Sequence of OperationMotor SPEED/CFM Configuration Heating Mode OperationVentilation Mode Tecenergy Recovery Ventilator System General Description Changing to Fully Modulating Mode Changing Ventilation CFM Rates in Manual ModeWinter Heating Performance Indoor Design Conditions 70F DB Performance and Application DataERV Modulating Mode Jumper PIN on P Terminal ERV Manual Mode Jumper PIN on M TerminalIndoor Air Supply Air Outdoor Air Ventilation Airflow DiagramERV Access Control Board CONFIGURATION/SETTING SpecificationsSelection of Voltage Outputs WiringAccessing Menu Parameters MountingMenu Descriptions Frequency Energy Recovery Ventilator Maintenance General InformationCleanability and Performance Maintenance Procedures Quarterly MaintenanceAnnual Maintenance Codes Function Solid State Heat Pump Control Troubleshooting ProcedureTroubleshooting Temperature F VS Resistance R of Temperature Sensor Checking Temperature SensorTroubleshooting ECM 142R Outdoor FAN Motor Replacing the Motor Troubleshooting ECM 142R Outdoor FAN MotorCooling Mode Heat Pump ModeTroubleshooting Indoor ECM Blower Motors Troubleshooting Indoor ECM Blower Motors Cont’d Refrigerant Charge FAN Blade Setting DimensionsControl Connector Motor Half Power Connector Motor HalfFull Load Heating PRESSURE/TEMPERATURE Full Load Cooling PRESSURE/TEMPERATUREPart Load Heating PRESSURE/TEMPERATURE Part Load Cooling PRESSURE/TEMPERATURE