V-Belts

V-belt removal and replacement is simply a matter of loosening the V-belts, rolling them off of the pulleys, replacing them with new belts, then retensioning them.

Always replace V-belts with a matched set of 3 belts, or belt tension may not be even among the 3 belts and may cause premature belt failure.

To adjust/replace the V-belts, do these steps:

1.DISCONNECT THE PLANER FROM THE POWER SOURCE!

2.Open the motor access panel and V-belt cover.

3.Using a 19mm wrench, loosen the fasteners on the tension rods shown in Figure 13.

4.Lift the motor up and slide the V-belts off of the pulleys.

5.Slide the new belts onto the pulley, lower the motor, and tighten the fasteners loosened in Step 3.

6. Close the V-belt cover and motor access panel.

Note: The correct tension for the V-belts is 14" deflection when pushed in the center with moderate pressure. After the first 16 hours of belt life, retension them, as they will stretch and seat during this time.

OFF

Figure 13. Fasteners needed to be loosened for V-belt replacement.

MAINTENANCE

-24-

Image 26
Contents Planer Page Contents Service Introduction Woodstock Technical SupportSpecifications Controls and Features Safety Standard Safety InstructionsAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety Instructions for Planers Extension Cords Electrical220V Operation GroundingUnpacking SET UPItems Needed for Set Up InventoryHardware and Tools Machine PlacementLifting Planer Cleaning Machine These items are coated and must be cleanedExtension Wings Extension wing fasteners Leveling controlsDust Hood To install the handwheel, do these stepsHandwheel Gearbox Oil Level Connecting to PowerKnife Setting Gauge To check the gearbox oil level, do these stepsTighten V-Belts Recommended AdjustmentsTest Run To perform a test run, do these stepsBasic Operation OperationsGeneral Basic steps of operating the planer are as followsOperation Tips Feed Speed Feed control knob positionsBed Rollers Adjustment Height Range 002-0.020To adjust the bed rollers, do these steps Accessories Planer AccessoriesOFF Maintenance Schedule MaintenanceCleaning To adjust/replace the V-belts, do these steps BeltsLubrication To inspect the knives, do these steps ServiceInspecting Knives Setting/Replacing Knives To set the knives, do these stepsTo adjust the chain tension, do these steps Chain TensionTable Parallelism Maximum Allowable TolerancesTo adjust the table parallelism, do these steps Table micro-adjustment screwsRollers, Chip Breaker Pressure Bar Heights Distance Below Knife Edge at *BDCRoller height adjustment 27, 28,Service To adjust roller spring tension, do these steps Spring TensionScale Calibration Chip Deflector Gap SettingTo adjust the deflector position, do these steps To calibrate the scale, do these stepsAnti-Kickback Fingers Anti-kickback fingersPulley Alignment Checking belt alignmentW1747 Electrical Components W1747 motor junction boxW1747 Wiring Diagram Troubleshooting Moving parts have come to a complete stopCutting Headstock Assembly Parts Breakdown Headstock Assembly Parts List PART# DescriptionXPN09M Table, Base, and Columns Parts Breakdown Table, Base, and Columns Parts List Stand/Motor Assembly Parts Breakdown Stand/Motor Assembly Parts List Parts Warranty Warranty Registration CommentsBOX BELLINGHAM, WA