Sterling SSV-052R, SSV-05R operating instructions XSV-05/R

Page 30

XSV-05/R

1.25” OD

Dimensions and data are not binding. All dimensions are in mm (in.). All data are subject to change.

XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style

29 of 36

Image 30
Contents SSV-05R Page Parts and Service Department Table of Contents Safety Instructions Page Explanations and Information Operating PersonnelFor Your Safety How to Use This ManualMaintenance Responsibility Unit Safety Installation General Information XSV-05 PartsInstalling the Conveyor Hopper Installing the Control and Maintenance Unit Control and Maintenance UnitConnecting the Compressed Air Supply Venturi AssemblyElectrical Connection Check with the local electricity board for regulationsFunctional Description Method of FunctioningControl and Maintenance Unit Setup Setting the Mixing Ratio of the Components XSV-05/2R UnitsPreparations Basic Setting of the Filling Level in the Conveyor Hopper Filling Level Too HighFine Adjustment of the Filling Level in the Conveyor Hopper Maintenance Maintenance Intervals DailyCleaning/Replacing the Filter Cartridge XSV-05Adjusting the Level Probe DisassemblyTroubleshooting ProblemPage Technical Data Dimension Sheet XSV-05/R XSV-05/2R Spare Parts Lists XSV-05R XSV-05/2R Position ID Number Designation Quick Start Guide -XSV Venturi Loader Technical Assistance Parts Department