Sterling SSV-052R Setup, Preparations, Setting the Mixing Ratio of the Components XSV-05/2R Units

Page 19

Chapter 4: Setup

»

4-1

This chapter is intended for the operating personnel of the equipment.

General knowledge of operating conveyor units is required. The functional description must be read and understood.

Make sure that in each case the operating personnel are sufficiently informed.

Preparations

Check to see if the venturi assembly is inserted in the material to be conveyed.

Switch the compressed air supply ON at the compressed air source.

Switch the conveyor unit electrical switch ON at the control and maintenance unit.

The conveyor unit should now convey until the conveyor hopper is filled up to the level sensor.

4-2 Setting the Mixing Ratio of the Components (XSV-05/2R Units)

The mixing ratio of the components is adjusted at the regulator. By changing the regulator pressure of each material, you will adjust the rate at which each material is conveyed into the conveyor hopper. This will determine the ratio of two materials entering a conveyor hopper.

The adjustment of the regulator will vary according

to the material, flow properties, particle size and conveying distance.

XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style

18of 36

Image 19 Contents
SSV-05R Page Parts and Service Department Table of Contents Safety Instructions Page Operating Personnel Explanations and InformationHow to Use This Manual For Your SafetyMaintenance Responsibility Unit Safety Installation XSV-05 Parts General InformationInstalling the Conveyor Hopper Control and Maintenance Unit Installing the Control and Maintenance Unit Venturi Assembly Connecting the Compressed Air SupplyCheck with the local electricity board for regulations Electrical ConnectionMethod of Functioning Functional DescriptionControl and Maintenance Unit Setting the Mixing Ratio of the Components XSV-05/2R Units SetupPreparations Filling Level Too High Basic Setting of the Filling Level in the Conveyor HopperFine Adjustment of the Filling Level in the Conveyor Hopper Maintenance Daily Maintenance IntervalsXSV-05 Cleaning/Replacing the Filter CartridgeDisassembly Adjusting the Level ProbeProblem TroubleshootingPage Technical Data Dimension Sheet XSV-05/R XSV-05/2R Spare Parts Lists XSV-05R XSV-05/2R Position ID Number Designation Quick Start Guide -XSV Venturi Loader Parts Department Technical Assistance