Sterling SSV-05R, SSV-052R operating instructions Installing the Control and Maintenance Unit

Page 14

2-3 Installing the Control and Maintenance Unit

Install the control and maintenance unit at a freely accessible site. Check the length of the connection cable and the length of the supplied hoses to the venturi assemblies.

Figure 2: Control and Maintenance Unit

During installation, check the length of the air supply lines.

XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style

13 of 36

Image 14 Contents
SSV-05R Page Parts and Service Department Table of Contents Safety Instructions Page Explanations and Information Operating PersonnelFor Your Safety How to Use This ManualMaintenance Responsibility Unit Safety Installation General Information XSV-05 PartsInstalling the Conveyor Hopper Installing the Control and Maintenance Unit Control and Maintenance UnitConnecting the Compressed Air Supply Venturi AssemblyElectrical Connection Check with the local electricity board for regulationsFunctional Description Method of FunctioningControl and Maintenance Unit Preparations SetupSetting the Mixing Ratio of the Components XSV-05/2R Units Basic Setting of the Filling Level in the Conveyor Hopper Filling Level Too HighFine Adjustment of the Filling Level in the Conveyor Hopper Maintenance Maintenance Intervals DailyCleaning/Replacing the Filter Cartridge XSV-05Adjusting the Level Probe DisassemblyTroubleshooting ProblemPage Technical Data Dimension Sheet XSV-05/R XSV-05/2R Spare Parts Lists XSV-05R XSV-05/2R Position ID Number Designation Quick Start Guide -XSV Venturi Loader Technical Assistance Parts Department