Sterling SSV-052R, SSV-05R operating instructions Explanations and Information, Operating Personnel

Page 7

1-2 Explanations and Information

Various terms and designations are used frequently in these operating instructions to ensure clarity. Therefore, please note that the terms used in the text are defined as follows:

Equipment

Equipment can mean an individual unit, a machine, or an installation.

Operating Personnel

Operating personnel are individuals who are responsible for operating the equipment. All personnel engaged in the use of the machine should become familiar with its operation as described in the manual. Each individual must take responsibility for understanding and following all safety rules. Operating personnel should be at least 16 years old.

Operator

The operator of the equipment (production manager, foreman, etc.) is the person responsible for all production sequences. The operator instructs the operating personnel on what should be done.

Operating Instructions

The plant operating instructions describe the interaction of the equipment, production sequences or methods. The plant operating instructions must be compiled by the operator of the equipment.

Equipment Foreman

When several operating personnel work on one machine, the equipment foreman arranges the order. The equipment foreman must be appointed by the operator.

Trained Personnel

Trained personnel are persons who, due to their training, are authorized to perform the required work.

XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style

6 of 36

Image 7
Contents SSV-05R Page Parts and Service Department Table of Contents Safety Instructions Page Operating Personnel Explanations and InformationHow to Use This Manual For Your SafetyMaintenance Responsibility Unit Safety Installation XSV-05 Parts General InformationInstalling the Conveyor Hopper Control and Maintenance Unit Installing the Control and Maintenance UnitVenturi Assembly Connecting the Compressed Air SupplyCheck with the local electricity board for regulations Electrical ConnectionMethod of Functioning Functional DescriptionControl and Maintenance Unit Setting the Mixing Ratio of the Components XSV-05/2R Units SetupPreparations Filling Level Too High Basic Setting of the Filling Level in the Conveyor HopperFine Adjustment of the Filling Level in the Conveyor Hopper Maintenance Daily Maintenance IntervalsXSV-05 Cleaning/Replacing the Filter CartridgeDisassembly Adjusting the Level ProbeProblem TroubleshootingPage Technical Data Dimension Sheet XSV-05/R XSV-05/2R Spare Parts Lists XSV-05R XSV-05/2R Position ID Number Designation Quick Start Guide -XSV Venturi Loader Parts Department Technical Assistance