Shindaiwa DGW310MC, DGW310DMC owner manual Stopping, Selection Welding Cable

Page 24

7-2 Stopping

1. Turn the breaker to OFF .

2 .Turn the slow-down switch to ON .

3. Keep the engine (cool down) for about 5 minutes.

4. Turn the starter switch to STOP .

5. After the engine stops, turn the fuel lever to CLOSE .

Caution

When the engine will not stop in spite of turning the starter switch to STOP, turn the fuel lever to CLOSE,

 

 

 

 

 

then the engine will stop in a few minutes. In this case, be sure to consult with our authorized distributor

 

 

 

 

 

or our service section and ask to repair.

 

 

8.Welding

 

 

Operation

 

 

8-1. Selection – Welding Cable

Select the cable in proper gauge, based on the allowable amperage and the length, per the table shown below.

The welding capacity is to reduce if the small gauge or long cable is used.

Caution

Welding cables should be used unstrained. When the welding cable are used in swirl, the welding

capacity is to reduce

 

 

 

 

 

 

 

 

 

 

 

 

 

Size of Cable

Unit

 

mm2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Return

 

 

 

 

 

 

 

 

 

 

Length

20m

30m

 

40m

 

60m

 

80m

100m

 

 

 

 

 

 

 

 

 

 

Current

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

300A

30

38

 

50

 

80

 

100

125

 

 

 

 

 

 

 

 

 

 

 

 

250A

22

30

 

38

 

60

 

80

100

 

 

 

 

 

 

 

 

 

 

 

 

200A

22

30

 

30

 

50

60

80

 

 

 

 

 

 

 

 

 

 

150A

22

22

 

22

 

38

 

50

60

 

 

 

 

 

 

 

 

 

 

 

 

100A

22

22

 

22

 

30

 

30

38

 

 

 

 

 

 

 

 

 

 

 

 

22

Image 24
Contents DGW310DMC DGW310MC Page Introduction Other types of caution Even som e of the items notedSafety Guidelines Page Page Location of warning labels Specifications DGW310DMC DGW310MCUse DGW310DMC DGW310MC DGW310DMC Eco Welding DisplayFrequency Selection Monitor LampWater Temperature Monitor Lamp Battery Charge Monitor LampOil Pressure Monitor Lamp Remote Control Box Option How to connect remote control boxElcb and Grounding Grounding Operation CheckStop RUN StopSlow-down』Feature Elcb has activatedSAE30 SAE20 Filling the sub tank FullFilling the radiator Fuel Fuel, Engine Oil and Water LeakageBattery Fluid level is lower than the Lower levelStarting StartKeep the engine idle for about 5 minutes Stopping Selection Welding CablePolarity Connection Welding CableWelding DGW310DMCECO DGW310MCMIN MAX ECO P 200/220V 3-P 4-Wires Output Range21-P 200/220V P 100/110VPower Consumption Output LimitationOutput Operation 』29 Simultaneous use of Generating and Welding Check and Maintenance Check Time Check Items Startup 1Change Engine Oil Clean/Change Air Element Change Oil FilterClean/Change Fuel Strainer CloseLong-Term Storage Change Coolant/WaterTroubleshooting Regular Dual( ) Memo