Shindaiwa
DGW310MC, DGW310DMC
owner manual
Memo
Troubleshooting
Specification
P 200/220V 3-P 4-Wires
Maintenance
Battery Charge Monitor Lamp
Clean/Change Air Element
Remote Control Box Option
Safety
Power Consumption
Slow-down』Feature
Page 42
MEMO
Shindaiwa Corporation
Hiroshima Japan
2006.10
Page 41
Page 42
Image 42
Page 41
Page 42
Contents
DGW310DMC DGW310MC
Page
Introduction
Other types of caution Even som e of the items noted
Safety Guidelines
Page
Page
Location of warning labels
Specifications
DGW310DMC DGW310MC
Use
DGW310DMC
DGW310MC DGW310DMC
Frequency Selection
Eco Welding
Display
Monitor Lamp
Water Temperature Monitor Lamp
Battery Charge Monitor Lamp
Oil Pressure Monitor Lamp
Remote Control Box Option
How to connect remote control box
Elcb and Grounding
Stop RUN
Grounding
Operation Check
Stop
Slow-down』Feature
Elcb has activated
SAE30 SAE20
Filling the sub tank
Full
Filling the radiator
Fuel
Fuel, Engine Oil and Water Leakage
Battery
Fluid level is lower than the Lower level
Starting
Start
Keep the engine idle for about 5 minutes
Stopping
Selection Welding Cable
Polarity
Connection Welding Cable
Welding
DGW310DMC
ECO
DGW310MC
MIN MAX ECO
21-P 200/220V
P 200/220V 3-P 4-Wires
Output Range
P 100/110V
Power Consumption
Output Limitation
Output
Operation
』29
Simultaneous use of Generating and Welding
Check and Maintenance
Check Time Check Items Startup
1Change Engine Oil
Clean/Change Air Element
Change Oil Filter
Clean/Change Fuel Strainer
Close
Long-Term Storage
Change Coolant/Water
Troubleshooting
Regular
Dual
( )
Memo
Related pages
What is the process for
piltide printimine
using PictBridge?
Top
Page
Image
Contents