Shindaiwa DGW310DMC, DGW310MC owner manual Troubleshooting

Page 39

If the equipment will not be used for more than 2 months, perform the following maintenance and storage

procedure.

 

 

 

 

 

 

 

1

Remove the battery. (Refer to 6-5. Check Battery

 

 

 

2

 

 

 

 

 

 

 

Change the engine oil. (Refer to

11. Check & Maintenance

 

 

 

 

 

 

3 Drain the fuel from the fuel tank and the strainer. Refer to 11. Check & Maintenance

 

4

Clean all the parts, cover the equipment and keep in the clean and dry place.

 

 

Caution

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recharge the removed battery once a month.

 

 

 

 

13. Troubleshooting

Danger: Electric Shock

Do not operate the equipment if the equipment or you are wet.

Before performing any equipment check or maintenance, stop the engine.

Caution: Injuries

Before performing any equipment check or maintenance, stop the engine.

Caution: Fire/Burns

Keep the equipment far away form fire.

Do not touch the engine and muffler during operation or immediately after stopping the equipment for the temperature reaches extremely high.

Follow the guideline below when performing any troubleshooting. If you can not resolve the problem by the troubleshooting guide, contact our authorized distributor or our service section to request the repair.

Symptoms

Presumable Causes

 

Actions

 

 

 

 

 

 

Starter motor will not start

1. Battery Weak

 

 

1. Recharge the Battery

 

2. Battery Dead

 

 

2. Replace the battery

 

 

 

 

 

 

 

 

 

 

1. Fuel Lever at

CLOSE

1. Fuel Lever to CLOSE

The engine will not start

2. Insufficient Fuel

 

2. Replenish fuel

 

3. Water or contaminants

 

3. Drain water or Clean

 

 

 

 

 

in the fuel

 

 

Fuel Tank & Strainer

 

 

4. Fuse burnt

4. Repair

37

Image 39
Contents DGW310DMC DGW310MC Page Other types of caution Even som e of the items noted IntroductionSafety Guidelines Page Page Location of warning labels DGW310DMC DGW310MC SpecificationsUse DGW310DMC DGW310MC DGW310DMC Monitor Lamp Eco WeldingDisplay Frequency SelectionWater Temperature Monitor Lamp Battery Charge Monitor LampOil Pressure Monitor Lamp How to connect remote control box Remote Control Box OptionElcb and Grounding Stop GroundingOperation Check Stop RUNElcb has activated Slow-down』FeatureSAE30 SAE20 Filling the sub tank FullFilling the radiator Fuel, Engine Oil and Water Leakage FuelFluid level is lower than the Lower level BatteryStart StartingKeep the engine idle for about 5 minutes Selection Welding Cable StoppingConnection Welding Cable PolarityDGW310DMC WeldingECO DGW310MCMIN MAX ECO P 100/110V P 200/220V 3-P 4-WiresOutput Range 21-P 200/220VPower Consumption Output LimitationOutput Operation 』29 Simultaneous use of Generating and Welding Check and Maintenance Check Time Check Items Startup 1Change Engine Oil Change Oil Filter Clean/Change Air ElementClose Clean/Change Fuel StrainerChange Coolant/Water Long-Term StorageTroubleshooting Dual Regular( ) Memo