Thermo Products MHA1-100N, MDA1-50N Typical Gas Piping, Installation of Natural GAS Piping

Page 26

All installations and services must be performed by qualified service personnel.

GROUND JOINT

MANUAL GAS

SHUT OFF VALVE

STREET ELBOW

GAS VALVE

18" N.P.T. MANIFOLD PRESSURE TAP

SEDIMENT TRAP

5 FT.

MHA1 SERIES

NOTE:

ACTUAL UNIT MAY

DIFFER SLIGHTLY FROM WHAT IS SHOWN.

Figure 6: Typical Gas Piping

1. INSTALLATION OF NATURAL GAS PIPING

The installation of the gas piping and the following test procedures must be performed by a qualified installer or service person.

The following chart may be used as a guide in sizing natural gas supply piping. The input loading of all gas appliances installed on any main or trunk line must be totaled to determine its required carrying capacity.

EXAMPLE: A line must supply a furnace of 100,000 BTU/hr input, a hot water heater of 40,000 BTU/hr input and gas range with a 30,000 BTU/hr input capacity. The total BTU/hr input loading on the line is 170,000 BTU/hr. The 200,000 BTU/hr column on the chart must be used in sizing the pipe.

23

Image 26
Contents Induced Draft Highboy COUNTERFLOW/HORIZONTAL GAS Furnace Section Safety II. Installation Guidelines Page Packaging Shipping DamageSafety II. Installation Guidelines CodesInstallation Location Closet and Alcove InstallationNon-combustible Material Standard ClearancesRefer to Figure Plenum Flue or Vent All Models Covered by This ManualAir for Combustion and Ventilation MDA1 Horizontal Installation MDA1 Installed Horizontal Filters/ Filter Installation Duct Work and Air ConditioningUse of Non-Thermo Pride Filter Retention Means Optional Thermo Pride Filter RackFPM FormulaVenting Replacing An Existing Furnace From a Common Vent Carbon Monoxide Poisoning HazardCondensing in the Chimney Page Page Vent Connection to Inducer Inducer Mounting Sidewall Venting Automated Literature FAXHorizontal Size and Lengths for Horizontal Vents Horizontal Size and Length for Sidewall VentingGAS Piping General GAS Piping Fire or Explosion HazardPage Installation of Natural GAS Piping Typical Gas PipingInstallation of Propane GAS Piping Steel Pipe Size for Natural Gas IPSPage Field Wiring and Replacing Wiring ElectricalElectronic Air Cleaner and Humidifier Connections Room ThermostatBlower and Control Panel To delay fan Set Switch Initial StartupWhat to do if YOU Smell GAS To Turn Off Gas To Appliance Adjustment Of Heat Input Rate Page Burner Adjustment Setting Supply Air Temperature Rise Typical Observation of Main Burner FlamesCheckout Procedure Important Remove flue blockage when doneDiagnostic Features LED will also flash once at power-upShut off gas and disconnect power before continuing General InspectionHouse Air Blower Return Air Filter Filter Maintenance ProcedureFilter Replacement VI. Installers Instructions to User Appendix a Sources for Reference Standards Appendix B Sequence of Operations Sequence of Operations for Heating SystemMode of Operation Control System Action Appendix C Troubleshooting Flowcharts Heating SystemYes Is ignitor positioned Correctly? Does system run until thermostat is satisfied? MDA1/MHA1-50S00S4426 Description Part Number QTYAppendix E Replacement Parts List MHA1 Page Replacement Parts List MDA1 Page Appendix F Wiring Diagram Page Appendix G MID-EFFICENCY Furnace Specifications MID-EFFICIENCY Highboy GAS Furnace SPECIFICATIONS5Nominal temp. rise Heating fan speed