All installations and services must be performed by qualified service personnel.
Table 6: Blower delay settings for heating cycles
To delay fan |
| Set Switch |
#1 | #2 | |
15 sec. | Off | Off |
30 sec. | Off | On |
*45 sec. | On | Off |
60 sec, | On | On |
To delay fan | Set Switch | |
#3 | #4 | |
60 sec. | On | On |
90 sec. | Off | On |
120 sec. | On | Off |
*180 sec. | Off | Off |
*Factory settings for optimal performance
III.Initial Operation of the Furnace:
A.Initial Startup:
:
•Turn off power to furnace. Before the gas piping system is placed into service, it must have been leak tested by a qualified heating contractor. (Refer to the General Gas Piping Requirements section of this manual regarding the installation and leak testing of gas piping).
•For initial
Review the following items before the initial startup. It may be helpful to review the Sequence of Operations in Appendix B of this manual, also.
a.Check all wiring for loose connections and proper
29