installation and user information
installation process
Adequate ventilation and cable pathways should be provided between all machines. Refer to the hp visualization center sv6 Site Prep Guide for the specifications for your configuration.
2.Position console monitors
Set up console monitor(s) according to their respective installation instructions. Pay close attention to both ergonomic positioning recommendations and the monitor’s relationship to a wide field display option if it is used.
See the “Working In Comfort” documentation at http://www.hp.com/ergo for complete information on safely preparing your work environment and other ergonomic issues.
3.Connect Power, I/O Devices
If you have multiple racks, connect them as indicated by the labels on the disconnected cables. Use the diagram below as a general cable reference:
Figure 2-11 Workstation Cabling
•See power, space, and cooling requirements in the hp visualization center sv6 Site Prep Guide.
Chapter 2 | 39 |