Lochinvar GAS HEATER FOR COMMERICAL POOL APPLICATIONS service manual Outdoor Installation Venting

Page 25

Installation and Service Manual

Vertical Combustion Air Inlet Clearances

You must locate the air inlet termination elbow at least 12" (30cm) above the roof or above normal snow levels.

If the air inlet cap is within a 10 foot (3.05m) radius of the flue outlet, the point of termination for the combustion air inlet cap must be at least 3 feet (0.91m) below the point of flue gas termination (vent cap).

Do not install the combustion air inlet cap closer than 10 feet (3.05m) from an inside corner of an L-shaped structure.

Horizontal Combustion Air Inlet Clearances

You must locate the horizontal air inlet termination point at least 12" (30cm) above grade and above normal snow levels.

If the air inlet cap is within a 10 foot (3.05m) radius of the flue outlet, the point of termination for the combustion air inlet cap must be at least 3 feet (0.91m) horizontally and 12 inches (30cm) below the point of flue gas termination (vent cap). Do not install the horizontal combustion air inlet cap above the flue outlet.

Do not install the combustion air inlet cap closer than 10 feet (3.05m) from an inside corner of an L-shaped structure.

Multiple Sidewall Direct Vent Installations

The combustion air inlet caps for multiple pool heater installations must maintain the same minimum clearance from the closest flue vent cap as specified in single pool heater installations. You may install multiple flue outlet caps side-by- side and multiple combustion air inlet caps side-by-side, but the air inlet must always be at least 3 feet (0.91m) horizontally and 12 inches (30cm) below the closest flue outlet. Do not install combustion air inlet caps above the flue outlets.

Maintain all clearances and installation requirements for multiple pool heater installations.

6. Outdoor Installation Venting

IMPORTANT: Before installing a venting system, follow all venting clearances and requirements found in the Venting, General Information section, page 10.

These pool heaters are self-venting and can be used outdoors when installed with the optional outdoor cap. This cap mounts directly to the top of the pool heater and covers the flue outlet and combustion air inlet openings. No additional vent piping is required.

￿WARNING: Only install outdoor models outdoors and only use the vent cap supplied by the pool heater manufacturer. Personal injury or product damage may result if any other cap is used or if an outdoor model is used indoors. Properly install all covers, doors and jacket panels to ensure proper operation and to prevent a hazardous condition.

Combustion air supply must be free of contaminants (see Combustion and Ventilation Air, page 7). To prevent recirculation of the flue products into the combustion air inlet, follow all instructions in this section.

Outdoor Vent/Air Inlet Location

Keep venting areas free of obstructions. Keep area clean and free of combustible and flammable materials. Maintain a minimum clearance of 3" (76mm) to combustible surfaces and a minimum of 3" (76mm) clearance to the air inlet. To avoid a blocked air inlet or blocked flue condition, keep the outdoor cap air inlet, flue outlet and drain slot clear of snow, ice, leaves, debris, etc.

Do not install outdoor models directly on the ground. You must install the outdoor pool heater on a concrete, brick, block, or other non-combustible pad.

Do not locate the pool heater so that high winds can deflect off of adjacent walls, buildings or shrubbery causing recirculation. Recirculation of flue products may cause operational problems, bad combustion or damage to controls. Locate unit at least 3 feet (0.91m) from any wall or vertical surface to prevent wind conditions from affecting performance.

Multiple pool heater outdoor installations require 48" (1.22m) clearance between each vent cap. Locate the outdoor cap at least 48" (1.22m) below and 48" (1.22m) horizontally from any window, door, walkway or gravity air intake.

Locate the pool heater at least 10 feet (3.05m) away from any forced air inlet.

Locate pool heater at least 3 feet (0.91m) outside any overhang.

Clearances around outdoor installations can change with time. Do not allow the growth of trees, shrubs or other plants to obstruct the proper operation of the outdoor vent system.

Do not install in locations where rain from building runoff drains will spill onto the pool heater.

E–G

Outdoor Vent Cap Kit

25

Image 25
Contents GAS Heaters for Commercial Pool Applications Commercial Pool Heaters Unpacking General Product InformationCommercial Pool Heaters Product Identification Base for Combustible Floors Clearances from Combustible ConstructionCombustion Air Filter Freeze ProtectionCombustion Air Options InstallationCombustion Air from Interior Space Exhaust FansVenting Support General InformationVertical Vent Termination Clearances and Location Table B Sidewall Vent Termination Clearances and LocationLength of Air Inlet Pipe Combustion Air Inlet PipingSidewall Air Inlet Combined Air Inlet Points Vertical Rooftop Air InletConventional Negative Draft Venting Vent System OptionsNegative Draft Flue Outlet Piping Masonry Chimney InstallationsCommon Venting Systems Inspection of a Masonry Chimney Vertical DirectAire VentingSidewall Venting Vent KitsVenting of Flue Products Sidewall Venting Termination Sidewall FanSidewall Venting Without Fan Masonry Chimney Installation TABLE-E Horizontal DirectAire VentingDirect Venting Flue Pipe Materials Horizontal DV Venting TerminationCombustion Air Inlet Piping Air Inlet Piping Materials Length of Air Inlet PipeSealing Type-B Doublewall Vent Pipe or Galvanized Vent Pipe Vertical Rooftop Air Inlet Combined Combustion Air Inlet PointsOutdoor Vent/Air Inlet Location Outdoor Installation Venting3-Way Valve Cover Installation Combustion Air Fan Adjustment for startupGas Pressure Test Outdoor Vent Cap KitGas Piping Connecting Gas Piping to the Pool HeaterGas Train and Controls Venting of Combination Gas Valves Combination Gas ValvesChecking Gas Supply Pressure TABLE-JTable K Multiple Unit Installations Gas Supply Pipe SizingMeasuring Net Manifold Gas Pressure Gas Manifold Pressure AdjustmentPumped Automatic Bypass Auxiliary Mixed Water Limit ControlWay Valve Cover Heater is Within 15 Feet of Pool Piping Heaters are within 15 feet Perpendicular of Pool Piping Relief Valve Water Flow SwitchAutomatic Chlorinator and Chemical Feeders Service Indicator Option Pump Purge Delay OptionWay Automatic Bypass Valve Wiring TABLE-M Terminal Strip Connection OptionsLighting Instructions OperationTo Turn Off Gas To Pool Heater Pre-Start ChecklistStarting the Filter System Operation Error Messages Displayed by the Temperature Controller Programming ModeHot Surface Igniter and Ignition Control Module Diagnostic Status IndicationHot Surface Ignition Control Module Ignition Module Lockout FunctionsTABLE-N Access to Internal Control PanelIgnition and Control Timings TABLE-O Water ChemistryTest Recommended Level TABLE-PCirculating Pump Pipe Size RequirementsMinimum Pump Performance Heat ExchangerFlue Gas Passageways Cleaning Procedures High Water Temperature Limit ControlAppliance Area Water Circulating PumpHeat Exchanger Cleaning Burner Removal and CleaningElectrical Combustion and Ventilation AirFan Cleaning Adjusting Differential Air PressureCombustion Air Fan Adjustment Set-Up ProcedureServicing Hot Surface Igniter and Ignition Module Adjustment ProcedureIgnition System Checkout Sequence of Operation Glossary Prepurge Wiring BOX Connections Wiring BOX Connections Ladder Diagram Control BOX Connections Commercial Pool Heaters Appendix a View Menu Item Menu Description Appendix B