Lochinvar
GAS HEATER FOR COMMERICAL POOL APPLICATIONS
service manual
Ladder Diagram
Install
Ladder Diagram
Pump Purge Delay Option
Wiring BOX Connections
Diagnostic Status Indication
Set-Up Procedure
Checklist
Burner Removal and Cleaning
Water Flow Switch
Programming Mode
Page 56
Commercial Pool Heaters
LADDER DIAGRAM
56
Page 55
Page 57
Image 56
Page 55
Page 57
Contents
GAS Heaters for Commercial Pool Applications
Commercial Pool Heaters
General Product Information
Unpacking
Commercial Pool Heaters
Product Identification
Clearances from Combustible Construction
Base for Combustible Floors
Freeze Protection
Combustion Air Filter
Installation
Combustion Air Options
Exhaust Fans
Combustion Air from Interior Space
Vertical Vent Termination Clearances and Location
General Information
Venting Support
Sidewall Vent Termination Clearances and Location
Table B
Sidewall Air Inlet
Combustion Air Inlet Piping
Length of Air Inlet Pipe
Vertical Rooftop Air Inlet
Combined Air Inlet Points
Negative Draft
Vent System Options
Conventional Negative Draft Venting
Common Venting Systems
Masonry Chimney Installations
Flue Outlet Piping
Vertical DirectAire Venting
Inspection of a Masonry Chimney
Venting of Flue Products
Vent Kits
Sidewall Venting
Sidewall Venting Without Fan
Sidewall Fan
Sidewall Venting Termination
Masonry Chimney Installation
Horizontal DirectAire Venting
TABLE-E
Direct Venting
Combustion Air Inlet Piping
Horizontal DV Venting Termination
Flue Pipe Materials
Sealing Type-B Doublewall Vent Pipe or Galvanized Vent Pipe
Length of Air Inlet Pipe
Air Inlet Piping Materials
Combined Combustion Air Inlet Points
Vertical Rooftop Air Inlet
Outdoor Installation Venting
Outdoor Vent/Air Inlet Location
Combustion Air Fan Adjustment for startup
3-Way Valve Cover Installation
Gas Pressure Test
Outdoor Vent Cap Kit
Gas Train and Controls
Connecting Gas Piping to the Pool Heater
Gas Piping
Combination Gas Valves
Venting of Combination Gas Valves
Checking Gas Supply Pressure
TABLE-J
Multiple Unit Installations Gas Supply Pipe Sizing
Table K
Gas Manifold Pressure Adjustment
Measuring Net Manifold Gas Pressure
Auxiliary Mixed Water Limit Control
Pumped Automatic Bypass
Way Valve Cover
Heater is Within 15 Feet of Pool Piping
Heaters are within 15 feet Perpendicular of Pool Piping
Automatic Chlorinator and Chemical Feeders
Water Flow Switch
Relief Valve
Way Automatic Bypass Valve Wiring
Pump Purge Delay Option
Service Indicator Option
Terminal Strip Connection Options
TABLE-M
Operation
Lighting Instructions
Starting the Filter System
Pre-Start Checklist
To Turn Off Gas To Pool Heater
Operation
Programming Mode
Error Messages Displayed by the Temperature Controller
Diagnostic Status Indication
Hot Surface Igniter and Ignition Control Module
Hot Surface Ignition Control Module
Ignition Module Lockout Functions
Ignition and Control Timings
Access to Internal Control Panel
TABLE-N
Water Chemistry
TABLE-O
TABLE-P
Test Recommended Level
Pipe Size Requirements
Circulating Pump
Minimum Pump Performance
Heat Exchanger
High Water Temperature Limit Control
Flue Gas Passageways Cleaning Procedures
Appliance Area
Water Circulating Pump
Burner Removal and Cleaning
Heat Exchanger Cleaning
Electrical
Combustion and Ventilation Air
Adjusting Differential Air Pressure
Fan Cleaning
Combustion Air Fan Adjustment
Set-Up Procedure
Ignition System Checkout
Adjustment Procedure
Servicing Hot Surface Igniter and Ignition Module
Sequence of Operation
Glossary
Prepurge
Wiring BOX Connections
Wiring BOX Connections
Ladder Diagram
Control BOX Connections
Commercial Pool Heaters Appendix a
Appendix B
View Menu Item Menu Description
Related pages
All Diagram page
What should I do if my Invertec V155-S won't start?
Find out here
Top
Page
Image
Contents