Quadra-Fire CB1200I-B CB1200-I Pellet Insert Panel and Trim Set Cont’d, Completed View

Page 22

CB1200-I Pellet Insert

F. Panel and Trim Set (Cont’d)

R

7.Hold side curtains in open position and lower panel set over insert setting lower edge of top panel in slot between hopper lid and panel support as shown in Figure 22.1. Place existing screw head (installed in Figure 21.2) into locator hole in floor of insert. See Figure 22.2.

8.Lift hopper lid and press down on panel top while installing

(4) 8-32 x 3/8” screws into holes in panel support. (If screws have been factory installed, tighten to secure panel to panel support.) Return hopper lid to closed position.

9.Install a corner bracket on each side trim piece. Slide brackets into top trim from each side and secure with flathead screwdriver. Attach trim assembly to panel set as follows:

a. Ensure that brackets face towards the back.

b. Align trim assembly to panel set sides and slide down.

Figure 22.3

View of "L" Bracket

installed

Figure 22.4

Figure 22.1

Figure 22.5- Completed View

Figure 22.2

Page 22

7014-083C

October 26, 2006

Image 22
Contents CB1200I-B Welcome to the Quadra-Fire Family CB1200-I Pellet InsertTable of Contents Listing and Code Approvals Getting Started Design, Installation & Location ConsiderationsFire Safety Appliance LocationMeasuring Standards CB1200-I Pellet Insert Tools And Supplies NeededInspect Appliance & Components and Pre-Use Check List Dimensions and Clearances Appliance DimensionsShown with Rear Vent and Optional Outside Air Inch 0mm Clearance to Exposed Section and Face TrimFace Trim Floor Protection CB1200-I Pellet Insert Masonry Minimum OpeningCalculating Alternate Floor Protection Material Starter hole Mark area of floor to cut Vent Information Install vent at clearances specified byVent manufacturer CB1200-I Pellet Insert Equivalent Feet of Pipe Pipe Selection ChartExample of 3 Elbow-Rear Vent Termination Calculation Venting Systems CB1200-I Pellet Insert Full Reline With Outside Air You must use a Quadra-Fire Outside Air Kit for instal Mobile Home InstallationLation in a mobile home Rear Shroud Installation Appliance Set-UpInstalling Rear Shroud Attaching Shroud to Hopper Body Rear Vent Installation PreparationFor Top Vent Installation To adjust hopper Adjustable Hopper OptionsOptional Grille Installation CB1200-I Pellet Insert Outside Air Kit InstructionsCB1200-I Pellet Insert Adjustable Hearth Support Size 9d x 45w, 2 to 10 Height AdjustmentCB1200-I Pellet Insert Panel and Trim Set CB1200-I Pellet Insert Panel and Trim Set Cont’d Completed ViewCharred Areas in the Back Operating Instructions Fuel Size And Material General Operating InformationFeed Rate Adjustment Instructions Fuel Adjustment Control RodFire Characteristics CB1200-I Pellet Insert Before Your First FireFrequently Asked Questions Do not Leave Firepot Floor OpenSymptom TroubleshootingPossible Cause Corrective Action Page Page CB10Maintaining & Servicing Your Appliance Pellet InsertCleaning Exhaust Path Cleaning Heat Exchanger ChambersCleaning Beneath Heat Exchanger Cleaning the Glass Frequency As neededHigh Ash Fuel Content Maintenance Igniter Replacement Replacing Side Glass Top frame when removing and replacing center GlassReplacing Center Glass Ered Phillips head screw driver to remove ScrewsReference Materials Component FunctionSnap Disc #1 Convection Blower 125F Vacuum SwitchWiring Harness See .1 below Snap Disc #2 Fuel Delivery Interrupt 200FBeginning Manufacture Date April 8 CB1200-I Pellet Insert Component LocationsExploded Views Glass Size Center 13-7/8 wide x 11 high Glass Size SidesBeg. Manufacture Date July Nbr Description CB1200-I Pellet Insert Service Parts and AccessoriesItem # Part Descsription, Alphabetical Order 7014-083C October 26 Item No Accessories ApplianceCB1200-I Pellet Insert Service And Maintenance Log Date of Service Performed By Description of ServiceLifetime Warranty CB1200-I Pellet Insert Warranty PolicyCB1200-I Pellet Insert Telephone