Quadra-Fire CB1200I-B owner manual Igniter Replacement

Page 33

R

CB1200-I Pellet Insert

Firepot Overfills

Pellets Back Up

In Feed Tube

 

Ash Build Up in Firebox

 

Figure 33.1

Incorrect

Tall, Lazy Flame, Orange in Color

Figure 33.2

Correct

Correct Flame Size, Yellow/White in Color

Figure 33.3

WARNING

Fire Risk.

High ash fuels, or lack of maintenance, can cause the firepot to fill with ash and clinker. If the firepot fills to the top, immediately shut down the unit and clean.

Failure to do so could result in smoking, sooting and possible hopper fires.

D. Igniter Replacement

Igniter Bracket

Thumb Screw

Igniter

Figure 33.4

a.Shut down the appliance by turning down the thermostat and let the appliance completely cool down. After the appliance has cooled down, unplug it and remove the ash pan.

b.The wire leads to the igniter are connected to the wire harness with 1/4 inch male / female spade connectors. These wires will pull forward approximately 4 to 5 inches (102mm to 127mm). Disconnect the spade connections and remove the igniter from the chamber. Loosen the thumb screw and slide igniter out.

c.Install new igniter into the chamber and tighten the thumb screw. Re-connect the wires to the 2 leads with the spade connectors.

d.Push excess wire leads to take-up the 4 to 5 inches (102mm to 107mm) previously pulled out. This will keep the wires out of the way of the ash pan. Double check that the igniter wires are clear of any movement, i.e. ash pan, firepot cleaning rod, etc.

f. Re-install the ash pan and re-connect the power.

October 26, 2006

7014-083C

Page 33

Image 33
Contents CB1200I-B CB1200-I Pellet Insert Welcome to the Quadra-Fire FamilyTable of Contents Listing and Code Approvals Fire Safety Design, Installation & Location ConsiderationsGetting Started Appliance LocationCB1200-I Pellet Insert Tools And Supplies Needed Measuring StandardsInspect Appliance & Components and Pre-Use Check List Appliance Dimensions Dimensions and ClearancesInch 0mm Clearance to Exposed Section and Face Trim Shown with Rear Vent and Optional Outside AirFace Trim CB1200-I Pellet Insert Masonry Minimum Opening Floor ProtectionCalculating Alternate Floor Protection Material Starter hole Mark area of floor to cut Install vent at clearances specified by Vent InformationVent manufacturer Pipe Selection Chart CB1200-I Pellet Insert Equivalent Feet of PipeExample of 3 Elbow-Rear Vent Termination Calculation Venting Systems CB1200-I Pellet Insert Full Reline With Outside Air Mobile Home Installation You must use a Quadra-Fire Outside Air Kit for instalLation in a mobile home Appliance Set-Up Rear Shroud InstallationRear Vent Installation Preparation Installing Rear Shroud Attaching Shroud to Hopper BodyFor Top Vent Installation Optional Grille Installation Adjustable Hopper OptionsTo adjust hopper CB1200-I Pellet Insert Outside Air Kit InstructionsSize 9d x 45w, 2 to 10 Height Adjustment CB1200-I Pellet Insert Adjustable Hearth SupportCB1200-I Pellet Insert Panel and Trim Set Completed View CB1200-I Pellet Insert Panel and Trim Set Cont’dCharred Areas in the Back Fuel Size And Material General Operating Information Operating InstructionsFire Characteristics Fuel Adjustment Control RodFeed Rate Adjustment Instructions CB1200-I Pellet Insert Before Your First FireDo not Leave Firepot Floor Open Frequently Asked QuestionsTroubleshooting SymptomPossible Cause Corrective Action Page Page Pellet Insert CB10Maintaining & Servicing Your ApplianceCleaning Beneath Heat Exchanger Cleaning Heat Exchanger ChambersCleaning Exhaust Path Cleaning the Glass Frequency As neededHigh Ash Fuel Content Maintenance Igniter Replacement Replacing Center Glass Top frame when removing and replacing center GlassReplacing Side Glass Ered Phillips head screw driver to remove ScrewsComponent Function Reference MaterialsWiring Harness See .1 below Vacuum SwitchSnap Disc #1 Convection Blower 125F Snap Disc #2 Fuel Delivery Interrupt 200FExploded Views CB1200-I Pellet Insert Component LocationsBeginning Manufacture Date April 8 Glass Size Center 13-7/8 wide x 11 high Glass Size SidesBeg. Manufacture Date July CB1200-I Pellet Insert Service Parts and Accessories Nbr DescriptionItem # Part Descsription, Alphabetical Order 7014-083C October 26 Appliance Item No AccessoriesDate of Service Performed By Description of Service CB1200-I Pellet Insert Service And Maintenance LogCB1200-I Pellet Insert Warranty Policy Lifetime WarrantyTelephone CB1200-I Pellet Insert