Quadra-Fire CB1200I-B owner manual Face Trim

Page 9

R

CB1200-I Pellet Insert

C.Minimum Clearances To Combustibles for Masonry and Zero Clearance Fireplaces

 

MANTEL

 

Face Trim

 

B

WALL

 

SIDE

C

 

A

 

E

D

Figure 9.1

 

 

Inches

Millimeters

A

Louvers to combustible

6

153

 

side wall

 

 

B

Insert top to mantel

12

305

C

Front Facing

3

76

D

Hearth Extension - Front

6

153

E

Hearth Extension - Sides

8

203

D.Minimum Opening for Masonry and Zero Clearance Fireplaces for Built-In Using Rear Shroud

B

C

A

 

 

D

Figure 9.2

NOTE: A Quadra-Fire floor protector (Part 811-0730) is available through your dealer to be used as a floor protector for the section under the insert body only. Floor protection to front and sides of insert unit must be supplied in addition to this part.

 

 

Inches

Millimeters

A

Rear Width

22

558

B

Depth

15-1/2

393

C*

Height - Top Vent

25-1/2

647

 

Height - Rear Vent

22-1/2

571

D

Front Width

29-1/4

743

*The size of your floor protector choice must be added to this dimension. If using Quadra-Fire floor protector, Part 811-0730, allow 1-1/2” (38mm).

October 26, 2006

7014-083C

Page

Image 9
Contents CB1200I-B CB1200-I Pellet Insert Welcome to the Quadra-Fire FamilyTable of Contents Listing and Code Approvals Fire Safety Design, Installation & Location ConsiderationsGetting Started Appliance LocationCB1200-I Pellet Insert Tools And Supplies Needed Measuring StandardsInspect Appliance & Components and Pre-Use Check List Appliance Dimensions Dimensions and ClearancesInch 0mm Clearance to Exposed Section and Face Trim Shown with Rear Vent and Optional Outside AirFace Trim CB1200-I Pellet Insert Masonry Minimum Opening Floor ProtectionCalculating Alternate Floor Protection Material Starter hole Mark area of floor to cut Install vent at clearances specified by Vent InformationVent manufacturer Pipe Selection Chart CB1200-I Pellet Insert Equivalent Feet of PipeExample of 3 Elbow-Rear Vent Termination Calculation Venting Systems CB1200-I Pellet Insert Full Reline With Outside Air Mobile Home Installation You must use a Quadra-Fire Outside Air Kit for instalLation in a mobile home Appliance Set-Up Rear Shroud InstallationRear Vent Installation Preparation Installing Rear Shroud Attaching Shroud to Hopper BodyFor Top Vent Installation Optional Grille Installation Adjustable Hopper OptionsTo adjust hopper CB1200-I Pellet Insert Outside Air Kit InstructionsSize 9d x 45w, 2 to 10 Height Adjustment CB1200-I Pellet Insert Adjustable Hearth SupportCB1200-I Pellet Insert Panel and Trim Set Completed View CB1200-I Pellet Insert Panel and Trim Set Cont’dCharred Areas in the Back Fuel Size And Material General Operating Information Operating InstructionsFire Characteristics Fuel Adjustment Control RodFeed Rate Adjustment Instructions CB1200-I Pellet Insert Before Your First FireDo not Leave Firepot Floor Open Frequently Asked QuestionsTroubleshooting SymptomPossible Cause Corrective Action Page Page Pellet Insert CB10Maintaining & Servicing Your ApplianceCleaning Beneath Heat Exchanger Cleaning Heat Exchanger ChambersCleaning Exhaust Path Cleaning the Glass Frequency As neededHigh Ash Fuel Content Maintenance Igniter Replacement Replacing Center Glass Top frame when removing and replacing center GlassReplacing Side Glass Ered Phillips head screw driver to remove ScrewsComponent Function Reference MaterialsWiring Harness See .1 below Vacuum SwitchSnap Disc #1 Convection Blower 125F Snap Disc #2 Fuel Delivery Interrupt 200FExploded Views CB1200-I Pellet Insert Component LocationsBeginning Manufacture Date April 8 Glass Size Center 13-7/8 wide x 11 high Glass Size SidesBeg. Manufacture Date July CB1200-I Pellet Insert Service Parts and Accessories Nbr DescriptionItem # Part Descsription, Alphabetical Order 7014-083C October 26 Appliance Item No AccessoriesDate of Service Performed By Description of Service CB1200-I Pellet Insert Service And Maintenance LogCB1200-I Pellet Insert Warranty Policy Lifetime WarrantyTelephone CB1200-I Pellet Insert