Quadra-Fire CB1200I-B owner manual

Page 28

CB1200-I Pellet Insert

R

Symptom

Possible Cause

Corrective Action

Slow or smoky start-up

Dirty exhaust and/or venting system.

Check for ash build up in appliance,

(Cont’d)

 

including behind rear panels, firebox, heat

 

 

exchanger, exhaust blower and venting.

Feed system fails to

Out of fuel.

Check hopper, fill with fuel.

start.

#2 snap disc may be defective.

Replace snap disc. Firebox door must be

 

 

 

closed securely.

 

Vacuum switch not closing. No vacuum.

Check exhaust blower is plugged in and

 

 

operating.

 

 

Check vacuum switch is plugged in.

 

 

Check vacuum hose is in good condition,

 

 

clear and connected at both ends.

 

 

Check thermocouple is in good condition

 

 

and plugged in properly.

 

 

Make sure venting system is clean.

 

 

NOTE: High winds blowing into the vent-

 

 

ing system can pressurize the firebox

 

 

causing loss of vacuum.

 

Feed system jammed or blocked.

Empty hopper of fuel. Use a wet/dry

 

 

vacuum cleaner to remove remaining fuel,

 

 

from hopper, including feed tube.

 

 

Check feed chute for obstructions.

 

 

Loosen 2 screws and jiggle feed assembly.

 

Feed spring not turning with feed motor.

Check that set screw is tight on feed

 

 

spring shaft at end of feed motor.

 

Feed motor defective or not plugged in.

Check connections on feed motor, replace

 

 

if defective.

No call light. Appliance

Thermostat not set to a high enough tempera-

Adjust thermostat above room tempera-

does not begin start

ture.

ture.

sequence.

Snap Disc #3 tripped.

Reset snap disc.

 

 

No power.

Connect to power.

 

Fuse blown.

Replace fuse.

 

Connections at thermostat and/or appliance not

Check connections at thermostat and

 

making proper contact.

appliance.

 

Defective thermostat or thermostat wiring.

Replace thermostat or wiring.

 

 

NOTE: To test thermostat and wiring, use

 

 

a jumper wire at the thermostat block on

 

 

the appliance to by-pass thermostat and

 

 

wiring.

 

Control box defective.

Replace control box.

 

 

Appliance fails to shut

Call light on.

Turn thermostat off.

off.

 

If call light does not go out, disconnect

 

 

thermostat wires from appliance. If call

 

 

light does go out, thermostat or wires are

 

 

defective.

 

 

 

Page 28

7014-083C

October 26, 2006

Image 28
Contents CB1200I-B Welcome to the Quadra-Fire Family CB1200-I Pellet InsertTable of Contents Listing and Code Approvals Design, Installation & Location Considerations Fire SafetyGetting Started Appliance LocationMeasuring Standards CB1200-I Pellet Insert Tools And Supplies NeededInspect Appliance & Components and Pre-Use Check List Dimensions and Clearances Appliance DimensionsShown with Rear Vent and Optional Outside Air Inch 0mm Clearance to Exposed Section and Face TrimFace Trim Floor Protection CB1200-I Pellet Insert Masonry Minimum OpeningCalculating Alternate Floor Protection Material Starter hole Mark area of floor to cut Vent Information Install vent at clearances specified byVent manufacturer CB1200-I Pellet Insert Equivalent Feet of Pipe Pipe Selection ChartExample of 3 Elbow-Rear Vent Termination Calculation Venting Systems CB1200-I Pellet Insert Full Reline With Outside Air You must use a Quadra-Fire Outside Air Kit for instal Mobile Home InstallationLation in a mobile home Rear Shroud Installation Appliance Set-UpInstalling Rear Shroud Attaching Shroud to Hopper Body Rear Vent Installation PreparationFor Top Vent Installation Adjustable Hopper Options Optional Grille InstallationTo adjust hopper CB1200-I Pellet Insert Outside Air Kit InstructionsCB1200-I Pellet Insert Adjustable Hearth Support Size 9d x 45w, 2 to 10 Height AdjustmentCB1200-I Pellet Insert Panel and Trim Set CB1200-I Pellet Insert Panel and Trim Set Cont’d Completed ViewCharred Areas in the Back Operating Instructions Fuel Size And Material General Operating InformationFuel Adjustment Control Rod Fire CharacteristicsFeed Rate Adjustment Instructions CB1200-I Pellet Insert Before Your First FireFrequently Asked Questions Do not Leave Firepot Floor OpenSymptom TroubleshootingPossible Cause Corrective Action Page Page CB10Maintaining & Servicing Your Appliance Pellet InsertCleaning Heat Exchanger Chambers Cleaning Beneath Heat ExchangerCleaning Exhaust Path Cleaning the Glass Frequency As neededHigh Ash Fuel Content Maintenance Igniter Replacement Top frame when removing and replacing center Glass Replacing Center GlassReplacing Side Glass Ered Phillips head screw driver to remove ScrewsReference Materials Component FunctionVacuum Switch Wiring Harness See .1 belowSnap Disc #1 Convection Blower 125F Snap Disc #2 Fuel Delivery Interrupt 200FCB1200-I Pellet Insert Component Locations Exploded ViewsBeginning Manufacture Date April 8 Glass Size Center 13-7/8 wide x 11 high Glass Size SidesBeg. Manufacture Date July Nbr Description CB1200-I Pellet Insert Service Parts and AccessoriesItem # Part Descsription, Alphabetical Order 7014-083C October 26 Item No Accessories ApplianceCB1200-I Pellet Insert Service And Maintenance Log Date of Service Performed By Description of ServiceLifetime Warranty CB1200-I Pellet Insert Warranty PolicyCB1200-I Pellet Insert Telephone