Quadra-Fire CB1200I-B owner manual Listing and Code Approvals

Page 4

CB1200-I Pellet Insert

Listing and Code Approvals

R

A. Appliance Certification

MODEL:

1200-I Pellet Insert

LABORATORY:

OMNI Test Laboratories, Inc

REPORT NO.

061-S-13-2

TYPE:

Solid Fuel Room Heater/Pellet Type

 

Insert

STANDARD:

ASTM E1509, ULC S628 and ULC/

 

ORD-C1482 Room Heater Pellet Fuel

 

Burning Type and (UM) 84-HUD, Mobile

 

Home Approved

B. Mobile Home Approved

This appliance is approved for mobile home installations when not installed in a sleeping room and when an outside combustion air inlet is provided. The structural integrity of the mobile home floor, ceiling, and walls must be maintained. The appliance must be properly grounded to the frame of the mobile home and use only listed pellet vent, Class “L” or “PL” connector pipe. A Quadra-Fire Outside Air Kit must be installed in a mobile home installation.

E. BTU & Efficiency Specifications

Emissions Rating:

.9 grams/hr

*BTU Output:

14,000 - 40,000 / hr

Heating Capacity:

up to 2,500 sq. ft.

Hopper Capacity:

60-75 lbs

Fuel:

Wood Pellets or Shelled Corn

Shipping Weight:

243 lbs

*BTU output will vary, depending on the brand of fuel you use in your appliance. Consult your Quadra-Fire dealer for best results.

NOTE: Hearth & Home Technologies, manufacturer of this appliance, reserves the right to alter its products, their specifications and/or price without notice.

C. Glass Specifications

This appliance is equipped with 5mm ceramic glass. Replace glass only with 5mm ceramic glass. Please contact your dealer for replacement glass.

NOTE: This installation must conform with local codes. In the absence of local codes you must comply with the

ASTM E1509, (UM) 84-HUD, ULC/ORD-C-1482

D. Electrical Rating

115 VAC, 60 Hz, Start 4.1 Amps, Run 1.1 Amps

Page

7014-083C

October 26, 2006

Image 4
Contents CB1200I-B Welcome to the Quadra-Fire Family CB1200-I Pellet InsertTable of Contents Listing and Code Approvals Design, Installation & Location Considerations Fire SafetyGetting Started Appliance LocationMeasuring Standards CB1200-I Pellet Insert Tools And Supplies NeededInspect Appliance & Components and Pre-Use Check List Dimensions and Clearances Appliance DimensionsShown with Rear Vent and Optional Outside Air Inch 0mm Clearance to Exposed Section and Face TrimFace Trim Floor Protection CB1200-I Pellet Insert Masonry Minimum OpeningCalculating Alternate Floor Protection Material Starter hole Mark area of floor to cut Vent Information Install vent at clearances specified byVent manufacturer CB1200-I Pellet Insert Equivalent Feet of Pipe Pipe Selection ChartExample of 3 Elbow-Rear Vent Termination Calculation Venting Systems CB1200-I Pellet Insert Full Reline With Outside Air You must use a Quadra-Fire Outside Air Kit for instal Mobile Home InstallationLation in a mobile home Rear Shroud Installation Appliance Set-UpInstalling Rear Shroud Attaching Shroud to Hopper Body Rear Vent Installation PreparationFor Top Vent Installation Adjustable Hopper Options Optional Grille InstallationTo adjust hopper CB1200-I Pellet Insert Outside Air Kit InstructionsCB1200-I Pellet Insert Adjustable Hearth Support Size 9d x 45w, 2 to 10 Height AdjustmentCB1200-I Pellet Insert Panel and Trim Set CB1200-I Pellet Insert Panel and Trim Set Cont’d Completed ViewCharred Areas in the Back Operating Instructions Fuel Size And Material General Operating InformationFuel Adjustment Control Rod Fire CharacteristicsFeed Rate Adjustment Instructions CB1200-I Pellet Insert Before Your First FireFrequently Asked Questions Do not Leave Firepot Floor OpenSymptom TroubleshootingPossible Cause Corrective Action Page Page CB10Maintaining & Servicing Your Appliance Pellet InsertCleaning Heat Exchanger Chambers Cleaning Beneath Heat ExchangerCleaning Exhaust Path Cleaning the Glass Frequency As neededHigh Ash Fuel Content Maintenance Igniter Replacement Top frame when removing and replacing center Glass Replacing Center GlassReplacing Side Glass Ered Phillips head screw driver to remove ScrewsReference Materials Component FunctionVacuum Switch Wiring Harness See .1 belowSnap Disc #1 Convection Blower 125F Snap Disc #2 Fuel Delivery Interrupt 200FCB1200-I Pellet Insert Component Locations Exploded ViewsBeginning Manufacture Date April 8 Glass Size Center 13-7/8 wide x 11 high Glass Size SidesBeg. Manufacture Date July Nbr Description CB1200-I Pellet Insert Service Parts and AccessoriesItem # Part Descsription, Alphabetical Order 7014-083C October 26 Item No Accessories ApplianceCB1200-I Pellet Insert Service And Maintenance Log Date of Service Performed By Description of ServiceLifetime Warranty CB1200-I Pellet Insert Warranty PolicyCB1200-I Pellet Insert Telephone