Quadra-Fire QV36-A, QV32-A manual Venting with Three 3 90 o Elbows

Page 23

VENTING WITH THREE (3) 90o ELBOWS

NATURAL GAS

V (MIN.)

H (MAX.)

H + H1(MAX.)

90o Elbow on Top

2 FT (610mm)

4 FT (1.22m)

1 FT (305mm)

3 FT (914mm)

6 FT (1.86m)

2 FT (610mm)

4 FT (1.22m)

8 FT (2.48m)

3 FT (914mm)

6 FT (1.86m)

12 FT (3.72m)

4 FT (1.22m)

8 FT (2.48m)

16 FT (4.8m)

5 FT (1.52m)

16 FT (4.8m)

16 FT (4.8m)

V + H + V1 + H1 MAX. = 40 FT (12.2m)

VENTING WITH THREE (3) 90o ELBOWS

PROPANE

V (MIN.)

H (MAX.)

H + H1(MAX.)

90o Elbow on Top

NOT ALLOWED

NOT ALLOWED

1 FT (305mm)

2 FT (610mm)

4 FT (1.22m)

2 FT (610mm)

4 FT (1.22m)

8 FT (2.48m)

3 FT (914mm)

6 FT (1.86m)

12 FT (3.72m)

4 FT (1.22m)

8 FT (2.48m)

16 FT (4.8m)

5 FT (1.52m)

16 FT (4.8m)

16 FT (4.8m)

V + H + V1 + H1 MAX. = 40 FT (12.2m)

H

H1

V1

Use SL D-Series components only.

Note: There MUST be a 25% reduction in total H when using flex vent, except when using the simple up and out installation (see Figure 9).

Figure 18. Venting with three 90° elbows

V

23

Image 23
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents Service Parts Standing Pilot Ignition / D’ALLUMAGE PAR Veilleuse Accessories / AccessoiresLog Set Assembly DF-36TS-BK Certification Installation CodesHigh Altitude Installations Appliance CertificationANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Village Collection Gas Fireplaces Diagram of the QV36-A Diagram of the QV-32-A Clearance Requirements Constructing the Fireplace ChaseLocating the Fireplace Framing the Fireplace Framing DimensionsDV-FLEX-10 47 3/4 Vent System Approvals Installing the Vent SystemIdentifying Vent Components Use D-Series components only Straight UP Vertical VentingUse SL D-Series components only Use SL D-Series components only Venting with Two 90 Elbows Natural GAS MAX. = 16 FT 4.8m V + V1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H Venting with Four 90 elbows SET of Collars YOU are Using could Cause a Fire Continue Adding Vent Components Adding Venting Components Install Support BracketsCeiling Firestop Ceiling Side Minimum Trapezoid CAP Termination Vent TerminationPositioned SO That the Arrow is Pointing UP 191mmVent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Positioning, Leveling, and Securing the FireplaceGas Control System Pressure Gas Supply LineGas Pressure Requirements To Check for GAS LeaksWall Switch Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesFinishing Refractory Kit Placement BRICK-291, BRICK-293Glass Specifications Installing Trim, Logs Ember MaterialBefore Lighting the Fireplace Double-check for faulty componentsWhat to do if YOU Smell GAS After the InstallationLighting the Appliance Standing Pilot IgnitionImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace MaintenanceTroubleshooting Be Placed in this Opening Lifetime Warranty