Quadra-Fire QV36-A, QV32-A manual Minimum Height from Roof to Lowest Discharge Opening

Page 31

For Vertical Terminations - To locate the vent and install the vent sections:

• Locate and mark the vent centerpoint on the underside

of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint

nail.

• The size of the roof hole framing dimensions depend on the

pitch of the roof. There MUST BE a 1-inch (25.4mm) clear-

ance from the vertical vent pipe to combustible materials.

• Mark the roof hole accordingly.

To seal the roof hole, and to divert rain and snow from the vent system:

Attach a flashing to the roof using nails, and use a non- hardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the vent pipe and rotate the pipe clockwise 1/4 turn.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters

and install the frame securely. Flashing anchored to the

frame must withstand heavy winds.

• Continue to install concentric vent sections up through

the roof hole and up past the roof line until you reach the

appropriate distance above the roof.

2 FT.

2 FT. MIN.

MIN.

 

 

LOWEST

 

DISCHARGE

TERMINATION

OPENING

 

CAP

 

HORIZONTAL

OVERHANG

VERTICAL

WALL

X

12

!WARNING: MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR

VENT HEIGHT ABOVE THE ROOF TOP. THESE MIN- IMUM HEIGHTS ARE NECESSARY IN THE INTER- EST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMI- NATION CAP IS AT LEAST TWO (2) FEET FROM A VERTICAL WALL AND 2-FEET BELOW A HORIZON- TAL OVERHANG.

NOTE: This also pertains to vertical vent systems in- stalled on the outside of the building.

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF

TO LOWEST DISCHARGE OPENING

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 32. Minimum Height from Roof to Lowest Discharge Opening

31

Image 31
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents Service Parts Standing Pilot Ignition / D’ALLUMAGE PAR Veilleuse Accessories / AccessoiresLog Set Assembly DF-36TS-BK Certification Installation CodesHigh Altitude Installations Appliance CertificationIntroducing the Village Collection Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the QV36-A Diagram of the QV-32-A Locating the Fireplace Constructing the Fireplace ChaseClearance Requirements Framing the Fireplace Framing DimensionsDV-FLEX-10 47 3/4 Identifying Vent Components Installing the Vent SystemVent System Approvals Use SL D-Series components only Straight UP Vertical VentingUse D-Series components only Use SL D-Series components only Venting with Two 90 Elbows Natural GAS MAX. = 16 FT 4.8m V + V1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H Venting with Four 90 elbows SET of Collars YOU are Using could Cause a Fire Continue Adding Vent Components Adding Venting Components Install Support BracketsCeiling Firestop Ceiling Side Minimum Trapezoid CAP Termination Vent TerminationPositioned SO That the Arrow is Pointing UP 191mmVent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Gas Control System Positioning, Leveling, and Securing the FireplaceStanding Pilot Ignition System Pressure Gas Supply LineGas Pressure Requirements To Check for GAS LeaksWall Switch Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesFinishing Refractory Kit Placement BRICK-291, BRICK-293Glass Specifications Installing Trim, Logs Ember MaterialBefore Lighting the Fireplace Double-check for faulty componentsWhat to do if YOU Smell GAS After the InstallationLighting the Appliance Standing Pilot IgnitionImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace MaintenanceTroubleshooting Be Placed in this Opening Lifetime Warranty