Quadra-Fire QV36-A Vent Termination, Positioned SO That the Arrow is Pointing UP, 191mm, 4 184mm

Page 29

C. Vent Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal vent:

Rotate and interlock the ends as described at the begin- ning of the Installing Vent Components section.

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior position on the building.

WARNING: THE TERMINATION CAP MUST BE

!POSITIONED SO THAT THE ARROW IS POINTING UP.

For roundcap termination kits:

Use the exterior pipelock hole on the round flange of the wall firestop to secure the vent pipe in place.

For trapezoidal cap termination kits:

Using screws secure the cap to the exterior wall through the flanges in the cap.

!WARNING: THE BOTTOM OF THE VENT TERMINATION CAP MUST BE A MINIMUM

OF 12 INCHES (305 MM) ABOVE GROUND LEVEL (GRADE). THE TOP OF THE CAP MUST BE A MIN- IMUM OF 18 INCHES (457 MM) BELOW COMBUS-

TIBLE MATERIAL, SUCH AS A DECK. THE SIDE OF THE CAP MUST BE A MINIMUM OF 6 INCHES (152 MM) AWAY FROM A PARALLEL OUTSIDE WALL. VENTING TERMINALS SHALL NOT BE RE- CESSED INTO A WALL OR SIDING. SEE THE DIA- GRAM FOR VENT TERMINATION CLEARANCES.

ROUND CAP TERMINATION

PERFORATION CANNOT BE

INSIDE THE WALL

71/2"

(191mm)

MINIMUM

TRAPEZOID CAP TERMINATION

7 1/4" (184mm)

Figure 30. Round & Trapezoid Termination Caps

29

Image 29
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents Service Parts Standing Pilot Ignition / D’ALLUMAGE PAR Veilleuse Accessories / AccessoiresLog Set Assembly DF-36TS-BK High Altitude Installations Installation CodesAppliance Certification CertificationANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Village Collection Gas Fireplaces Diagram of the QV36-A Diagram of the QV-32-A Clearance Requirements Constructing the Fireplace ChaseLocating the Fireplace Framing the Fireplace Framing DimensionsDV-FLEX-10 47 3/4 Vent System Approvals Installing the Vent SystemIdentifying Vent Components Use D-Series components only Straight UP Vertical VentingUse SL D-Series components only Use SL D-Series components only Venting with Two 90 Elbows Natural GAS MAX. = 16 FT 4.8m V + V1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H Venting with Four 90 elbows SET of Collars YOU are Using could Cause a Fire Continue Adding Vent Components Adding Venting Components Install Support BracketsCeiling Firestop Ceiling Side Positioned SO That the Arrow is Pointing UP Vent Termination191mm Minimum Trapezoid CAP TerminationVent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Positioning, Leveling, and Securing the FireplaceGas Control System Gas Pressure Requirements Gas Supply LineTo Check for GAS Leaks PressureFor Standing Pilot Ignition Wiring Appliance Requirements Wiring the FireplaceOptional Accessories Wall SwitchFinishing Refractory Kit Placement BRICK-291, BRICK-293Glass Specifications Installing Trim, Logs Ember MaterialBefore Lighting the Fireplace Double-check for faulty componentsLighting the Appliance After the InstallationStanding Pilot Ignition What to do if YOU Smell GASImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace MaintenanceTroubleshooting Be Placed in this Opening Lifetime Warranty