Majestic Appliances DVB4136 manual General Information Assembling Vent Pipes, Flex Vent Pipes

Page 14

DVB4136 Direct Vent Gas Fireplace

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

Outside Corner

Alcove Applications*

 

 

 

F =

 

 

G =

 

Combustible

G

Combustible

 

6"

(152 mm)

 

6" (152 mm)

V

Noncombustible

 

 

2"

(51 mm)

 

Noncombustible

 

V

 

F

 

2" (51 mm)

 

 

Balcony -

Balcony -

with no side wall

with perpendicular side wall

M

M

 

V

V

 

P

M =

Combustible &

Noncombustible

Combustible &

M = 24" (610 mm)

Noncombustible

P = 20” (508 mm)

12" (305 mm)

D

C C

V

E

O

E = Min. 6” (152 mm) for non-vinyl sidewalls Min. 12” (305 mm) for vinyl sidewalls

O = 8’ (2.4 m) Min.

No.

 

 

of Caps

DMin.

CMax.

1

3’ (914 mm)

2 x DActual

2

6’ (1.8 m)

1 x DActual

3

9’ (2.7 m)

2/3 x DActual

4

12’ (3.7 m)

1/2 x DActual

DMin. = # of Termination caps x 3

CMax. = (2 / # termination caps) x DActual

584-15

*NOTE: Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be a 3’ (914 mm) minimum between termination caps. 2. All mechanical air intakes within 10’ (1 m) of a termination cap must be a minimum of 3’ (914 mm) below the termination cap. 3. All gravity air intakes within 3’ (914 mm) of a termination cap must be a minimum of 1’ (305 mm) below the termination cap.

Fig. 15 Termination clearances.

General Information Assembling Vent Pipes

Canadian Installations

The venting system must be installed in accordance with the current CSA-B149.1 installation code.

USA Installations

The venting system must conform to local codes and/or the current National Fuel Code ANSI Z223.1/NFPA 54.

Only venting components manufactured by CFM Cor- poration may be used in Direct Vent systems.

Flex Vent Pipes

Before joining the flex vent pipe to the unit, apply a bead of high temperature sealant* (provided) to the 4” pipe exiting the fireplace. Secure flex vent piep in place with a hose clamp (provided).

*Be sure the flex pipe overlaps at least 1” (25mm) onto the collars of the fireplace and termination. If the ter- mination has an internal bead, be sure to overlap and secure 1” (25 mm) past the bead.

*Be sure the vent is actually crushed before proceed- ing. Apply a tug to be sure the vent will not slip off the collars.

Repeat process with 7” flex vent pipe. The same proce- dure must be performed on the vent side.

Apply High Temperature

Sealant

Hose Clamp

FP1471

Fig. 16 Apply high temperature sealant to 4” and 7” pipes.

14

20012322

Image 14
Contents Direct Vent Gas Fireplace Table of Contents Installation & Operating Instructions Please Read the Following CarefullyRequirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedFireplace Dimensions Installed as Top Vent Ref. DVB4136Ref. DV4136 Fireplace Dimensions Installed as Rear VentFraming Dimensions Q 40³⁄₈ 1026 mm R 40¹⁄₄ 1022 mm Mantels Locating Your FireplaceClearance to Combustibles HearthGas Specifications Gas Line InstallationFinal Finishing Gas Inlet and Manifold PressuresEB-1 Electrical Box Remote ON/OFF Switch InstallationAlternate Switch Location EB-1 receptacle Optional Top Vent Application Complete conversionGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationGeneral Information Assembling Vent Pipes Canadian InstallationsUSA Installations Flex Vent PipesRear Wall Vent Application How to Use the Vent GraphTwist Lock Pipes Rear Wall Vent Installation Twist Lock Pipe Zero clearance sleeve is only required for combustible wallsRear Wall Vent Installations Flex Vent Pipe Vertical Sidewall Application+ B = 17 Max Vertical Sidewall Installation Twist Lock Pipe Always install horizontal venting on a level planeVertical Sidewall Installation Flex Vent Pipe Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationVertical Through-the-Roof Installation Maximum elbow usageMin 610 mm Venting Components Operating Instructions Log Identification Chart Replacement Ceramic Hearth Panels if providedInstallation of Logs Logs ID #Left Log Top Center Log Top Front Log Top Right Log Inspecting the Venting System Flame & Temperature AdjustmentFlame Characteristics To Turn Off Gas To Heater Lighting and Operating InstructionsFor Fireplaces Equipped with the SIT 820 Valve Valve in the on position Lighting InstructionsTurning Off the Gas to the Appliance Lighting & Operating Instructions For Fireplaces equipped with AF4000 Gas ValveTroubleshooting the Gas Control System SIT Nova 820 Millivolt ValveTroubleshooting AF4000 ValveTroubleshooting AF4000 Valve Igniter operationAF4000 MOD Module End On Manual Mode Shut Off ProcedureTransmitter Operation Off Mode Instructions for RF Comfort Control ValveFan Override During Auto Mode Delay Timer ModeAuto Mode Change Between F/C Temperature UnitsLED Count Service Action Auto PathLocal Path On Path Burner Orifice Conversion Conversions must be completed by qualified personnelFuel Conversion Instructions SkyTech ValvePilot Orifice Conversion Installation PrecautionsConversion Procedure Model Fuel Type Front Rear Injector Orifice Size MatrixFront Rear Minimum Logs May Be HOT MaintenanceCleaning the Standing Pilot Control System Burner and Burner CompartmentDescription DVB4136 DVB4136 Description Fuel Conversion Kits FK24 Fan Assembly Optional AccessoriesFK12 Fan Assembly Hard Direct Wire Hook UpCeramic Refractory Panels Remote ControlsInstallation Instructions Decorative Bay WindowsArch/Square Face Kit Battery BackupInstallation Procedure Limited Lifetime Warranty Efficiency Ratings