Majestic Appliances DVB4136 Conversions must be completed by qualified personnel, SkyTech Valve

Page 41
3. Install the enclosed conversion label (F) to the valve body where it can easily be seen. (Fig. 67)
Valve conversion is complete.
E
2. Insure the rubber gasket (D) is properly positioned and install the new HI/LO pressure regulator assem- bly to the valve using the new screws (E) supplied with the kit. Tighten the screws securely. (Ref. torque = 25 in/lb) (Fig. 67)

DVB4136 Direct Vent Gas Fireplace

Conversions must be completed by qualified personnel

Fuel Conversion Instructions

To convert the DVB4136 units for use with a different gas follow these instructions. Before proceeding, turn control knob on valve to “OFF” and turn gas supply OFF. Turn OFF any electricity that may be going to the appliance.

CAUTION: Logs may be HOT! Allow to cool before proceeding.

1.Open louvre assembly bottom to gain access to valve. Remove window frame assembly. (See “Win- dow Frame Assembly Removal”, Page 24, Fig. 46)

2.Remove logs if previously installed.

SkyTech Valve

1.Remove rubber cap from valve. (Fig. 65)

2.Push pin in and turn so line on the end of the pin lines up with the appropriate gas. NAT for natural gas and LP for propane.

3.Replace cap.

4.Remove minimum rate screw and replace with new minimum rate screw supplied in kit. Refer to Table 1

on Page 42.

Main Connection

MAIN

Inlet

N

O

F

OFF

P

 

L

I

TO

 

D

FC108

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

Pilot Adj.

 

 

 

 

 

 

 

 

 

 

 

 

 

PILOT

 

 

 

 

 

Outlet

 

 

 

 

 

 

Rubber Cap

Minimum

Gas Type

 

Marker

 

FP1769a

Rate Screw

CO137

Fig. 65 Remove rubber cap and adjust gas type marker.

NOVA SIT820 Valve

1.Using the TORX T20 bit, remove and discard the three (3) pressure regulator mounting screws (A), pressure regulator tower (B) and the spring and diaphragm assembly (C). (Fig. 66)

A

B

C

OFF

P

Fig. 67 Replace regulator.

Burner Orifice Conversion

1.Remove the screws that secure the fettle and the burner tube assembly, located behind the burner tube assembly. Remove the three (3) screws that secure the burner housing assembly to the base pan at the right and left end of the burner housing as- sembly. (Fig. 68)

 

Pilot Location

Remove

Burner Housing

Screws

Assembly

 

Remove Screws

Fettle

Remove Screws

 

 

I

N

L

O

TO

FP1817

Burner Tube Assembly

FC107

Fig. 66 Remove mounting screws, pressure regulator tower and spring and diaphragm assembly.

Fig. 68 Remove screws holding burner housing assembly and burner tube assembly.

2.Remove the fettle and the burner tube assembly. Slide the burner housing assembly to the right and up to free the orifice.

20012322

41

Image 41
Contents Direct Vent Gas Fireplace Table of Contents Please Read the Following Carefully Installation & Operating InstructionsGas Equipment Venting System not Provided Requirements for the Commonwealth of MassachusettsRef. DVB4136 Fireplace Dimensions Installed as Top VentRef. DV4136 Fireplace Dimensions Installed as Rear VentFraming Dimensions Q 40³⁄₈ 1026 mm R 40¹⁄₄ 1022 mm Clearance to Combustibles Locating Your FireplaceMantels HearthFinal Finishing Gas Line InstallationGas Specifications Gas Inlet and Manifold PressuresEB-1 Electrical Box Remote ON/OFF Switch InstallationAlternate Switch Location EB-1 receptacle Complete conversion Optional Top Vent ApplicationLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes Flex Vent PipesRear Wall Vent Application How to Use the Vent GraphTwist Lock Pipes Zero clearance sleeve is only required for combustible walls Rear Wall Vent Installation Twist Lock PipeVertical Sidewall Application Rear Wall Vent Installations Flex Vent Pipe+ B = 17 Max Always install horizontal venting on a level plane Vertical Sidewall Installation Twist Lock PipeHorizontal length requirement Vertical Sidewall Installation Flex Vent PipeVertical Through-the-Roof Application Below Grade InstallationMaximum elbow usage Vertical Through-the-Roof InstallationMin 610 mm Venting Components Operating Instructions Installation of Logs Replacement Ceramic Hearth Panels if providedLog Identification Chart Logs ID #Left Log Top Center Log Top Front Log Top Right Log Inspecting the Venting System Flame & Temperature AdjustmentFlame Characteristics To Turn Off Gas To Heater Lighting and Operating InstructionsFor Fireplaces Equipped with the SIT 820 Valve Valve in the on position Lighting InstructionsTurning Off the Gas to the Appliance For Fireplaces equipped with AF4000 Gas Valve Lighting & Operating InstructionsSIT Nova 820 Millivolt Valve Troubleshooting the Gas Control SystemAF4000 Valve TroubleshootingIgniter operation Troubleshooting AF4000 ValveAF4000 MOD Module End Transmitter Operation Off Mode Shut Off ProcedureOn Manual Mode Instructions for RF Comfort Control ValveAuto Mode Delay Timer ModeFan Override During Auto Mode Change Between F/C Temperature UnitsAuto Path LED Count Service ActionLocal Path On Path Fuel Conversion Instructions Conversions must be completed by qualified personnelBurner Orifice Conversion SkyTech ValvePilot Orifice Conversion Installation PrecautionsConversion Procedure Model Fuel Type Front Rear Injector Orifice Size MatrixFront Rear Minimum Cleaning the Standing Pilot Control System MaintenanceLogs May Be HOT Burner and Burner CompartmentDescription DVB4136 DVB4136 Description Fuel Conversion Kits FK12 Fan Assembly Optional AccessoriesFK24 Fan Assembly Hard Direct Wire Hook UpInstallation Instructions Remote ControlsCeramic Refractory Panels Decorative Bay WindowsArch/Square Face Kit Battery BackupInstallation Procedure Limited Lifetime Warranty Efficiency Ratings