Kawasaki STX-15F Valve Guide Installation, Valve-to-Guide Clearance Measurement Wobble Method

Models: STX-15F

1 438
Download 438 pages 44.44 Kb
Page 203
Image 203

ENGINE TOP END 6-25

Valves

Valve Guide Installation

Apply engine oil to the valve guide outer surface before installation.

Heat the area around the valve guide hole to about 120 150°C (248 302°F).

Drive the valve guide in from the top of the head using the valve guide arbor. The flange stops the guide from going in too far.

Special Tool - Valve Guide Arbor, 5: 57001-1203

Ream the valve guide with valve guide reamer [A] even if the old guide is reused.

Special Tool - Valve Guide Reamer, 5: 57001-1204

Valve-to-Guide Clearance Measurement (Wobble

Method)

If a small bore gauge is not available, inspect the valve guide wear by measuring the valve to valve guide clearance with the wobble method as indicated below.

Insert a new valve [A] into the guide [B] and set a dial gauge against the stem perpendicular to it as close as possible to the cylinder head mating surface.

Move the stem back and forth [C] to measure valve/valve guide clearance.

Repeat the measurement in a direction at a right angle to the first.

If the reading exceeds the service limit, replace the guide.

NOTE

The reading is not actual valve/valve guide clearance because the measuring point is above the guide.

Valve/Valve Guide Clearance (Wobble Method)

Standard:

 

 

 

Exhaust

0.09

0.17 mm (0.0035

0.0067 in.)

Inlet

0.03

0.11 mm (0.0012

0.0043 in.)

Service Limit:

 

 

 

Exhaust

0.35 mm (0.014 in.)

 

Inlet

0.29 mm (0.011 in.)

 

Page 203
Image 203
Kawasaki STX-15F service manual Valve Guide Installation, Valve-to-Guide Clearance Measurement Wobble Method