Majestic Appliances DVB4136 manual Remote ON/OFF Switch Installation, Alternate Switch Location

Page 9

1/2” Gas Supply

1/2” NPT x 3/8” Flare Shut-

off Valve

3/8” Flex Line (from valve)

FP297a

Fig. 6 Typical gas supply installation.

Always check for gas leaks with a mild soap and water solution applied with a brush no larger than 1” (25 mm). Never apply soap and water solution with a spray bottle. Do not use an open flame for leak testing.

The fireplace valve must not be subjected to any test pressures exceeding 1/2 psi. Isolate or disconnect this or any other gas appliance control from the gas line when pressure testing.

The gas control is equipped with a captured screw type pressure test point, therefore it is not necessary to pro- vide a 1/8” test point up stream of the control.

When using copper or flex connector use only approved fittings. Always provide a union when using black iron pipe so that the gas line can be easily disconnected for burner or fan servicing. (Fig. 6) See the gas specifica- tions for pressure details and ratings.

Remote ON/OFF Switch Installation

Do not wire the remote ON/OFF wall switch for this gas appliance into a 120v power supply.

1.Thread wire through the electrical knockout located on either side of the unit. Take care not to cut the wire or insulation on metal edges. Ensure the wire is secured and protected from possible damage. Run one end of the gas control valve and the other end to the conveniently located wall switch.

2.Attach the wire to the ON/OFF switch and install switch into receptacle box. Attach cover plate to switch.

3.Connect wiring to gas valve. (Fig. 7)

 

Remote ON/OFF

 

Switch

 

TPTH

 

TP

 

TH

 

FP1218

Fig. 7

Remote switch wiring diagram for R models.

20012322

DVB4136 Direct Vent Gas Fireplace

Alternate Switch Location

The remote switch can be installed on either side of the access door. Mount the switch to the switch bracket provided. Screw the bracket on either side of the frame, line up the screws with the prepunched holes. (Fig. 8)

FP1024

Fig. 8 Alternate switch location.

EB-1 Electrical Box

The fireplace, when installed, must be electrically connected and grounded in accordance with local codes or, in the ab- sence of local codes, with the current CSA C22.1 Canadian Electrical Code.

For USA installations, follow the local codes and the national Electrical Code ANSI/NFPA No. 70.

It is strongly suggested that the wiring of the EB-1 Electrical Junction Box be carried out by a licensed electrician.

Ensure that the power to the supply line has been disconnected before commenc- ing this procedure.

The EB-1 electrical junction box has been supplied standard on the DV360/580 models to allow for the easy installation of an optional fan kit.

To connect the EB-1 box to the house electrical supply, follow the steps below.

1.Unscrew the retaining screw from the EB-1 base plate (Fig. 9) and remove the EB-1 assembly from the fireplace.

2.Remove the front cover of the EB-1 box.

3.Remove the plug socket assembly from the EB-1 box.

4.Feed the supply line in from the outside through the cable clamp. (Fig. 9)

5.Connect black wire of the power supply line to the brass screw (polarized) of the socket assembly.

6.Connect the white wire of the power line to the chrome screw of the socket assembly.

9

Image 9
Contents Direct Vent Gas Fireplace Table of Contents Please Read the Following Carefully Installation & Operating InstructionsGas Equipment Venting System not Provided Requirements for the Commonwealth of MassachusettsRef. DVB4136 Fireplace Dimensions Installed as Top VentFireplace Dimensions Installed as Rear Vent Framing Dimensions Q 40³⁄₈ 1026 mm R 40¹⁄₄ 1022 mmRef. DV4136 Clearance to Combustibles Locating Your FireplaceMantels HearthFinal Finishing Gas Line InstallationGas Specifications Gas Inlet and Manifold PressuresRemote ON/OFF Switch Installation Alternate Switch LocationEB-1 Electrical Box EB-1 receptacle Complete conversion Optional Top Vent ApplicationLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes Flex Vent PipesHow to Use the Vent Graph Twist Lock PipesRear Wall Vent Application Zero clearance sleeve is only required for combustible walls Rear Wall Vent Installation Twist Lock PipeVertical Sidewall Application Rear Wall Vent Installations Flex Vent Pipe+ B = 17 Max Always install horizontal venting on a level plane Vertical Sidewall Installation Twist Lock PipeHorizontal length requirement Vertical Sidewall Installation Flex Vent PipeVertical Through-the-Roof Application Below Grade InstallationMaximum elbow usage Vertical Through-the-Roof InstallationMin 610 mm Venting Components Operating Instructions Installation of Logs Replacement Ceramic Hearth Panels if providedLog Identification Chart Logs ID #Left Log Top Center Log Top Front Log Top Right Log Flame & Temperature Adjustment Flame CharacteristicsInspecting the Venting System Lighting and Operating Instructions For Fireplaces Equipped with the SIT 820 ValveTo Turn Off Gas To Heater Lighting Instructions Turning Off the Gas to the ApplianceValve in the on position For Fireplaces equipped with AF4000 Gas Valve Lighting & Operating InstructionsSIT Nova 820 Millivolt Valve Troubleshooting the Gas Control SystemAF4000 Valve TroubleshootingIgniter operation Troubleshooting AF4000 ValveAF4000 MOD Module End Transmitter Operation Off Mode Shut Off ProcedureOn Manual Mode Instructions for RF Comfort Control ValveAuto Mode Delay Timer ModeFan Override During Auto Mode Change Between F/C Temperature UnitsAuto Path LED Count Service ActionLocal Path On Path Fuel Conversion Instructions Conversions must be completed by qualified personnelBurner Orifice Conversion SkyTech ValveInstallation Precautions Conversion ProcedurePilot Orifice Conversion Injector Orifice Size Matrix Front Rear MinimumModel Fuel Type Front Rear Cleaning the Standing Pilot Control System MaintenanceLogs May Be HOT Burner and Burner CompartmentDescription DVB4136 DVB4136 Description Fuel Conversion Kits FK12 Fan Assembly Optional AccessoriesFK24 Fan Assembly Hard Direct Wire Hook UpInstallation Instructions Remote ControlsCeramic Refractory Panels Decorative Bay WindowsBattery Backup Installation ProcedureArch/Square Face Kit Limited Lifetime Warranty Efficiency Ratings