Majestic Appliances DVB4136 manual Vertical Through-the-Roof Installation, Maximum elbow usage

Page 22

DVB4136 Direct Vent Gas Fireplace

 

Max. Height 40’ (12.2 m)

 

Min. Height 8’ (2.4 m)

 

 

 

Max. 10’ (3 m)

 

 

Support Straps

 

 

Every 3’ (.9 m)

 

Max.

Max. 10’ (3 m)

 

Height 40’ (12.2 m)

 

 

Min.

 

 

Height 8’ (2.4 m)

 

 

 

FP1183

Fig. 39

Support straps for horizontal runs.

1 + 2 + 3 + 4 = 270°

 

1

1

2

2

3

3

4

4

 

FP1179

Fig. 40 Maximum elbow usage.

22

Vertical Through-the-Roof Installation

1.Locate your fireplace.

2.Plumb to center of the (4”) flue collar from ceiling above and mark position.

3.Cut opening equal to 9³⁄” x 9³⁄” (240 mm x 240 mm).

4.Proceed to plumb for additional openings through the roof. In all cases, the opening must provide a minimum of 1 inch clearance to the vent pipe, i.e., the hole must be at least 9³⁄” x 9³⁄” (240 mm x 240 mm).

5.Place fireplace into position.

6.Place firestop(s) #7DVFS or Attic Insulation Shield #7DVAIS into position and secure. (Fig. 41)

7.Install roof support (Fig. 42) and roof flashing making sure upper flange is below the shingles. (Fig. 44)

8.Install appropriate pipe sections until the venting is above the flashing. (Fig. 44)

9.Install storm collar and seal around the pipe.

10.Add additional vent lengths for proper height. (Fig. 44)

11.Apply high temperature sealant to 4” and 7” collars of vertical vent termination and install.

If there is a room above ceiling level, fire stop spacer must be installed on both the bottom ad the top side of the ceiling joists. If an attic is above ceiling level a 7DVAIS (Attic Insulation Shield) must be installed.

The enlarged ends of the vent section always face downward.

Attic Insulation

 

Shield

 

Upper Floor

 

11”

11”

(279 mm)

(279 mm)

Ceiling Installation

 

Joist

 

 

Firestop

 

Spacer

Nails (4)

FP1029

 

Fig. 41 Place firestop spacer(s) and secure.

 

20012322

Image 22
Contents Direct Vent Gas Fireplace Table of Contents Installation & Operating Instructions Please Read the Following CarefullyRequirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedFireplace Dimensions Installed as Top Vent Ref. DVB4136Framing Dimensions Q 40³⁄₈ 1026 mm R 40¹⁄₄ 1022 mm Fireplace Dimensions Installed as Rear VentRef. DV4136 Mantels Locating Your FireplaceClearance to Combustibles HearthGas Specifications Gas Line InstallationFinal Finishing Gas Inlet and Manifold PressuresAlternate Switch Location Remote ON/OFF Switch InstallationEB-1 Electrical Box EB-1 receptacle Optional Top Vent Application Complete conversionGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationGeneral Information Assembling Vent Pipes Canadian InstallationsUSA Installations Flex Vent PipesTwist Lock Pipes How to Use the Vent GraphRear Wall Vent Application Rear Wall Vent Installation Twist Lock Pipe Zero clearance sleeve is only required for combustible wallsRear Wall Vent Installations Flex Vent Pipe Vertical Sidewall Application+ B = 17 Max Vertical Sidewall Installation Twist Lock Pipe Always install horizontal venting on a level planeVertical Sidewall Installation Flex Vent Pipe Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationVertical Through-the-Roof Installation Maximum elbow usageMin 610 mm Venting Components Operating Instructions Log Identification Chart Replacement Ceramic Hearth Panels if providedInstallation of Logs Logs ID #Left Log Top Center Log Top Front Log Top Right Log Flame Characteristics Flame & Temperature AdjustmentInspecting the Venting System For Fireplaces Equipped with the SIT 820 Valve Lighting and Operating InstructionsTo Turn Off Gas To Heater Turning Off the Gas to the Appliance Lighting InstructionsValve in the on position Lighting & Operating Instructions For Fireplaces equipped with AF4000 Gas ValveTroubleshooting the Gas Control System SIT Nova 820 Millivolt ValveTroubleshooting AF4000 ValveTroubleshooting AF4000 Valve Igniter operationAF4000 MOD Module End On Manual Mode Shut Off ProcedureTransmitter Operation Off Mode Instructions for RF Comfort Control ValveFan Override During Auto Mode Delay Timer ModeAuto Mode Change Between F/C Temperature UnitsLED Count Service Action Auto PathLocal Path On Path Burner Orifice Conversion Conversions must be completed by qualified personnelFuel Conversion Instructions SkyTech ValveConversion Procedure Installation PrecautionsPilot Orifice Conversion Front Rear Minimum Injector Orifice Size MatrixModel Fuel Type Front Rear Logs May Be HOT MaintenanceCleaning the Standing Pilot Control System Burner and Burner CompartmentDescription DVB4136 DVB4136 Description Fuel Conversion Kits FK24 Fan Assembly Optional AccessoriesFK12 Fan Assembly Hard Direct Wire Hook UpCeramic Refractory Panels Remote ControlsInstallation Instructions Decorative Bay WindowsInstallation Procedure Battery BackupArch/Square Face Kit Limited Lifetime Warranty Efficiency Ratings