Goodman Mfg GAS-FIRED WARM AIR FURNACE Upright Standard Connections Left Side

Page 23

UPRIGHT INSTALLATIONS-TRAP ON LEFT SIDE

NOTE: For left side trap installation, grommets must be moved to the left side of the furnace and the plugs installed on the right side of the furnace.

1.Remove the rubber plug from the left side drain port on the front cover.

2.Secure Hose A to front cover drain port with a red hose clamp. Route hose to rear side panel grommet hole.

3.Cut and remove 1/4 inch from the end of the drain port on the rubber elbow.

4.Insert Tube 1 into rubber elbow drain port and secure with silver hose clamp. Angle tube outward toward front of furnace.

5.Cut “X” inches from the long end of Hose B and discard. Refer to table for appropriate length to cut. Secure remaining hose to Tube 1 with a green hose clamp. Route other end of Hose B to front left side panel grommet hole.

NOTE: Long hose “B” must always be connected to Tube 1 and the elbow and not on the front cover.

6.Insert short end of each Tube 2 through side panel grommet holes. Secure tubes to Hose A and Hose B with green hose clamps. Ensure hoses and tubes maintain a downward slope for proper drainage and that they are not kinked or binding.

LEFT

SIDE PANEL

FRONT COVER

DRAIN PORT

RED HOSE

CLAMP

HOSE A

SIDE PANEL

DRAIN

HOLES

TUBE(S) 2

DRAIN

TRAP

 

RUBBER

 

ELBOW

 

RUBBER

 

ELBOW

 

DRAIN PORT

 

SILVER HOSE

 

CLAMP

 

TUBE 1

 

GREEN HOSE

 

CLAMP

GREEN

HOSE B

 

HOSE CLAMP

 

Upright “Standard” Connections - Left Side

(Upflow Shown, Counterflow Similar)

23

Image 23
Contents GCH95/GME95/GCH9 Table of Contents XIX. Maintenance XIV. Startup Procedure & AdjustmentXVII. Safety Circuit Description XVIII. TroubleshootingCarbon Monoxide Poisoning Hazard Component Identification Upflow/HorizontalWhat to do if YOU Smell GAS II. Safety ConsiderationsIII. Product Application Electrostatic Discharge ESD PrecautionsGeneral IV. Location Requirements & ConsiderationsExisting Furnace Removal Clearances and AccessibilitySuspended Furnace Furnace SuspensionThermostat Location Thermostat InfluencesCombustion & Ventilation AIR Requirements See 5.3.3-a Horizontal Furnace VI. Installation PositionsVII. Horizontal Applications & Considerations Drain PAN Recommended Installation PositionsVIII. Propane GAS /HIGH Altitude Installations Alternate Electrical and GAS Line ConnectionsDirect Vent Terminal Clearances Proper VENT/FLUE and Combustion AIR Piping Practices IX. VENT/FLUE Pipe & Combustion AIR PipeDual Certification NON-DIRECT/DIRECT Vent Materials and Joining MethodsStandard Furnace Connections Increased Clearance ConfigurationTermination Locations Canadian Venting RequirementsAlternate Furnace Connections Vent/Flue Pipe CutsNON-DIRECT Vent Single Pipe Piping Alternate Vent/Flue LocationDirect Vent Dual Pipe Piping Concentric Vent Termination Alternate Horizontal Vent Termination Dual PipeTermination of Multiple Direct Vent Furnaces Condensate Drain Lines & Drain TrapStandard Right or Left Side Drain Hose Connections Hose and Tube IdentificationAlternate VENT/FLUE Drain Hose Connections Drain TrapUpright Standard Connections Left Side Upright INSTALLATIONS-TRAP on Left SideUpright Drain Trap Mounting Left or Right Side Panel Horizontal Installations Right Side DownHorizontal Drain Trap Mounting Left or Right Side Panel Left Side DownJunction BOX Relocation Wiring HarnessXI. Electrical Connections Junction Box RelocationGME95/AMEH96 Furnace with 2-STAGE Condenser Field Wiring Thermostat DiagramField Wiring for GME95 /AMEH96 Furnacewith 2-Stage Volt Thermostat WiringGAS Piping Connections Nals XII. GAS Supply and PipingVolt Humidifier Rack, manifold or gas valve Gas Piping Connections Horizontal Upflow ModelPropane GAS Tanks and Piping Propane Gas Installation TypPropane Gas Piping Chart XIII. Circulating AIR & FiltersBottom Return AIR Opening Upflow Models Checking Static Pressure 80% Furnace Shown, 90% SimilarDuct Flange Cut Outs Checking Duct StaticFilter Locations XIV. Startup Procedure & AdjustmentPermanent Minimum Filter Area sq. Disposable Minimum Filter area sq.GAS Supply Pressure Measurement White-Rodgers Model 36G54 Connected to ManometerWhite-Rodgers Model 36G54 Two-Stage Honeywell Model VR9205 Connected to ManometerGAS Input Rate Measurement Natural GAS only GAS Manifold Pressure Measurement and AdjustmentMeasuring Inlet Gas Pressure Alt. Method Circulator Blower Speeds Temperature Rise MeasurementTemperature Rise Heating Mode Circulator Blower FAN Timing AdjustmentSetting Furnace Operating Mode Power UPPage XVIII. Troubleshooting XIX. Maintenance XXI. Repair & Replacement Parts XX. Before Leaving AN InstallationNo signal Troubleshooting ChartContinuously Blower Performance Data MH95ACSH96 AMEH96 GCH95 / GCH9115 GME95 MH950453,0704,0905D MH950703,0904,1155 Wiring DiagramMH950905CX GME95 / AMEH96 Exemptions GAS Vent Directly BELOW. Keep Clear of ALL ObstructionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference