Goodman Mfg MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9 Horizontal Installations Right Side Down

Page 24

Cabinet Width

Models

"X" Length to Cut From Long

End of Hose B

(inches)

(kBTU_Tons)

(inches)

 

 

 

 

 

17 1/2

040_3, 045_30,

7

060_3

 

 

21

070_40, 080_5

3 1/2

 

 

 

24 1/2

090_50, 100_5

None

115_50

 

 

UPRIGHT DRAIN TRAP MOUNTING (LEFT OR RIGHT SIDE PANEL)

1.Insert drain tubes into drain trap and position the drain trap against the side panel. NOTE: Drain tubes must reach the bottom of the drain trap.

2.Secure drain trap to side panel at the mounting holes (dimples or crosshairs on counterflow models) located below the grommet drain holes.

3.Attach PVC drain line to drain trap outlet with either a 90° elbow or coupling.

HORIZONTAL INSTALLATIONS

RIGHT SIDE DOWN

Horizontal installations with the right side down require that the drain hoses be connected to the right side front cover drain port and the rubber elbow drain port.

NOTE: On counterflow models, relocation of the front cover pressure switch hose is required.

Make connections as follows:

1.Remove the rubber plug from right side of the front cover drain port.

Counterflow furnaces

Relocate the front cover pressure switch hose connection from the left side pressure tap to the right (down) side tap. The pressure switch hose must be connected to the down side to guard against blocked drain conditions. Cut hose to appropriate length to minimize sagging. Plug left (unused) pressure tap with plug removed from right side.

2.Secure Hose A to front cover drain tap with a red hose clamp. Route hose to rear right (down) side panel grommet holes.

3.Cut 1/4 inch from the end of the drain port on the rubber elbow and discard.

4.Insert Tube 1 into rubber elbow drain port and secure with a silver hose clamp. Angle tube outward toward front of furnace.

5.Cut 17 3/4 inches from the long end of Hose B and discard.

6.Secure remaining end of Hose B to exposed end of Tube 1 with a green hose clamp. Route hose to front right down side panel grommet holes.

7.Cut 5 1/2 inches straight length from the long end of each Tube 2 and discard the radius pieces.

8.Insert approximately one inch of each Tube 2 through the right down side panel grommet holes. Secure tubes to Hose A and Hose B using green hose clamps. Ensure hoses and tubes maintain a downward slope for proper drainage and are not kinked or bound.

For details concerning mounting of the drain trap, refer to Conden- sate Drain Lines and Drain Trap - Horizontal Drain Trap Mounting.

FRONT COVER

 

 

DRAIN PORT

 

 

RED HOSE

 

 

CLAMP

 

 

HOSE A

 

 

HOSE B

FRONT

 

COVER

 

 

PRESSURE

RUBBER

 

TAP

 

 

ELBOW

 

 

RIGHT

 

 

SIDE

TUBES 2

 

PANEL

 

 

 

GREEN

 

RUBBER ELBOW

 

 

DRAIN PORT

 

HOSE

TUBE 1

SILVER HOSE

DRAIN TRAP

CLAMP

 

(3 PLACES)

CLAMP

Horizontal Connections - Right Side Down

(Upflow Shown, Counterflow Similar)

24

Image 24
Contents GCH95/GME95/GCH9 Table of Contents XIV. Startup Procedure & Adjustment XVII. Safety Circuit DescriptionXVIII. Troubleshooting XIX. MaintenanceCarbon Monoxide Poisoning Hazard Upflow/Horizontal Component IdentificationII. Safety Considerations What to do if YOU Smell GASElectrostatic Discharge ESD Precautions III. Product ApplicationIV. Location Requirements & Considerations GeneralClearances and Accessibility Suspended FurnaceFurnace Suspension Existing Furnace RemovalThermostat Influences Combustion & Ventilation AIR RequirementsThermostat Location See 5.3.3-a VI. Installation Positions VII. Horizontal Applications & ConsiderationsHorizontal Furnace Recommended Installation Positions VIII. Propane GAS /HIGH Altitude InstallationsAlternate Electrical and GAS Line Connections Drain PANDirect Vent Terminal Clearances IX. VENT/FLUE Pipe & Combustion AIR Pipe Dual Certification NON-DIRECT/DIRECT VentMaterials and Joining Methods Proper VENT/FLUE and Combustion AIR Piping PracticesIncreased Clearance Configuration Termination LocationsCanadian Venting Requirements Standard Furnace ConnectionsVent/Flue Pipe Cuts Alternate Furnace ConnectionsAlternate Vent/Flue Location NON-DIRECT Vent Single Pipe PipingDirect Vent Dual Pipe Piping Alternate Horizontal Vent Termination Dual Pipe Termination of Multiple Direct Vent FurnacesCondensate Drain Lines & Drain Trap Concentric Vent TerminationHose and Tube Identification Standard Right or Left Side Drain Hose ConnectionsDrain Trap Alternate VENT/FLUE Drain Hose ConnectionsUpright INSTALLATIONS-TRAP on Left Side Upright Standard Connections Left SideHorizontal Installations Right Side Down Upright Drain Trap Mounting Left or Right Side PanelLeft Side Down Horizontal Drain Trap Mounting Left or Right Side PanelWiring Harness XI. Electrical ConnectionsJunction Box Relocation Junction BOX RelocationThermostat Diagram Field Wiring for GME95 /AMEH96 Furnacewith 2-StageVolt Thermostat Wiring GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringNals XII. GAS Supply and Piping Volt HumidifierGAS Piping Connections Rack, manifold or gas valve Horizontal Upflow Model Gas Piping ConnectionsPropane Gas Installation Typ Propane Gas Piping ChartXIII. Circulating AIR & Filters Propane GAS Tanks and PipingChecking Static Pressure 80% Furnace Shown, 90% Similar Duct Flange Cut OutsChecking Duct Static Bottom Return AIR Opening Upflow ModelsXIV. Startup Procedure & Adjustment Permanent Minimum Filter Area sq.Disposable Minimum Filter area sq. Filter LocationsWhite-Rodgers Model 36G54 Connected to Manometer White-Rodgers Model 36G54 Two-StageHoneywell Model VR9205 Connected to Manometer GAS Supply Pressure MeasurementGAS Manifold Pressure Measurement and Adjustment Measuring Inlet Gas Pressure Alt. MethodGAS Input Rate Measurement Natural GAS only Temperature Rise Measurement Temperature RiseCirculator Blower Speeds Circulator Blower FAN Timing Adjustment Setting Furnace Operating ModePower UP Heating ModePage XVIII. Troubleshooting XIX. Maintenance XX. Before Leaving AN Installation XXI. Repair & Replacement PartsTroubleshooting Chart No signalContinuously MH95 Blower Performance DataACSH96 AMEH96 GCH95 / GCH9115 GME95 Wiring Diagram MH950453,0704,0905D MH950703,0904,1155MH950905CX GME95 / AMEH96 GAS Vent Directly BELOW. Keep Clear of ALL Obstructions ExemptionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference