Goodman Mfg MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9, GAS-FIRED WARM AIR FURNACE MH950905CX

Page 50

WIRING DIAGRAM

ACSH96 / GCH95 / GCH9

 

 

 

*MH950905CX

UNIT.

MAY

 

 

HIGH VOLTAGE! DISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS

MULTIPLE POWER SOURCES MAY BE PRESENT. FAILURE TO DO SO

CAUSE PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.

 

Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.

50

Image 50
Contents GCH95/GME95/GCH9 Table of Contents XVIII. Troubleshooting XIV. Startup Procedure & AdjustmentXVII. Safety Circuit Description XIX. MaintenanceCarbon Monoxide Poisoning Hazard Upflow/Horizontal Component IdentificationII. Safety Considerations What to do if YOU Smell GASElectrostatic Discharge ESD Precautions III. Product ApplicationIV. Location Requirements & Considerations GeneralFurnace Suspension Clearances and AccessibilitySuspended Furnace Existing Furnace RemovalThermostat Location Thermostat InfluencesCombustion & Ventilation AIR Requirements See 5.3.3-a Horizontal Furnace VI. Installation PositionsVII. Horizontal Applications & Considerations Alternate Electrical and GAS Line Connections Recommended Installation PositionsVIII. Propane GAS /HIGH Altitude Installations Drain PANDirect Vent Terminal Clearances Materials and Joining Methods IX. VENT/FLUE Pipe & Combustion AIR PipeDual Certification NON-DIRECT/DIRECT Vent Proper VENT/FLUE and Combustion AIR Piping PracticesCanadian Venting Requirements Increased Clearance ConfigurationTermination Locations Standard Furnace ConnectionsVent/Flue Pipe Cuts Alternate Furnace ConnectionsAlternate Vent/Flue Location NON-DIRECT Vent Single Pipe PipingDirect Vent Dual Pipe Piping Condensate Drain Lines & Drain Trap Alternate Horizontal Vent Termination Dual PipeTermination of Multiple Direct Vent Furnaces Concentric Vent TerminationHose and Tube Identification Standard Right or Left Side Drain Hose ConnectionsDrain Trap Alternate VENT/FLUE Drain Hose ConnectionsUpright INSTALLATIONS-TRAP on Left Side Upright Standard Connections Left SideHorizontal Installations Right Side Down Upright Drain Trap Mounting Left or Right Side PanelLeft Side Down Horizontal Drain Trap Mounting Left or Right Side PanelJunction Box Relocation Wiring HarnessXI. Electrical Connections Junction BOX RelocationVolt Thermostat Wiring Thermostat DiagramField Wiring for GME95 /AMEH96 Furnacewith 2-Stage GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringGAS Piping Connections Nals XII. GAS Supply and PipingVolt Humidifier Rack, manifold or gas valve Horizontal Upflow Model Gas Piping ConnectionsXIII. Circulating AIR & Filters Propane Gas Installation TypPropane Gas Piping Chart Propane GAS Tanks and PipingChecking Duct Static Checking Static Pressure 80% Furnace Shown, 90% SimilarDuct Flange Cut Outs Bottom Return AIR Opening Upflow ModelsDisposable Minimum Filter area sq. XIV. Startup Procedure & AdjustmentPermanent Minimum Filter Area sq. Filter LocationsHoneywell Model VR9205 Connected to Manometer White-Rodgers Model 36G54 Connected to ManometerWhite-Rodgers Model 36G54 Two-Stage GAS Supply Pressure MeasurementGAS Input Rate Measurement Natural GAS only GAS Manifold Pressure Measurement and AdjustmentMeasuring Inlet Gas Pressure Alt. Method Circulator Blower Speeds Temperature Rise MeasurementTemperature Rise Power UP Circulator Blower FAN Timing AdjustmentSetting Furnace Operating Mode Heating ModePage XVIII. Troubleshooting XIX. Maintenance XX. Before Leaving AN Installation XXI. Repair & Replacement PartsTroubleshooting Chart No signalContinuously MH95 Blower Performance DataACSH96 AMEH96 GCH95 / GCH9115 GME95 Wiring Diagram MH950453,0704,0905D MH950703,0904,1155MH950905CX GME95 / AMEH96 GAS Vent Directly BELOW. Keep Clear of ALL Obstructions ExemptionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference