IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.

-DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE.

-WHAT TO DO IF YOU SMELL GAS:

*DO NOT TRY TO LIGHT ANY APPLIANCE.

*DO NOT TOUCH ANY ELECTRICAL SWITCH; DO NOT USE ANY PHONE IN YOUR BUILDING.

*IMMEDIATELY CALL YOUR GAS SUPPLIER FROM A NEIGHBORS PHONE. FOLLOW THE GAS SUPPLIERS INSTRUCTIONS.

*IF YOU CANNOT READCH YOUR GAS SUPPLIER, CALL THE FIRE DEPARTMENT.

-INSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER, SERVICE AGENCY OR THE GAS SUPPLIER

WARNING

SHOULD OVERHEATING OCCUR OR THE GAS SUPPLY FAIL TO SHUT OFF, TURN OFF THE MANUAL GAS SHUTOFF VALVE EXTERNAL TO THE FURNACE BEFORE TURNING OFF THE ELECTRICAL SUPPLY.

CARBON MONOXIDE POISONING HAZARD

Special Warning for Installation of Furnace or Air Handling Units in Enclosed Areas such as Garages, Utility Rooms or Parking Areas

Carbon monoxide producing devices (such as an automobile, space heater, gas water heater, etc.) should not be operated in enclosed areas such as unventilated garages, utility rooms or parking areas because of the danger of carbon monoxide (CO) poisoning resulting from the exhaust emissions. If a furnace or air handler is installed in an enclosed area such as a garage, utility room or parking area and a carbon monoxide producing device is operated therein, there must be adequate, direct outside ventilation.

This ventilation is necessary to avoid the danger of CO poisoning which can occur if a carbon monoxide producing device continues to operate in the enclosed area. Carbon monoxide emissions can be (re)circulated throughout the structure if the furnace or air handler is operating in any mode.

CO can cause serious illness including permanent brain damage or death.

B10259-216

SHIPPING INSPECTION

All units are securely packed in shipping containers tested according to International Safe TransitAssociation specifications. The carton must be checked upon arrival for external damage. If damage is found, a request for inspection by carrier’s agent must be made in writing immediately.

The furnace must be carefully inspected on arrival for damage and bolts or screws which may have come loose in transit. In the event of damage the consignee should:

1.Make a notation on delivery receipt of any visible damage to shipment or container.

2.Notify carrier promptly and request an inspection.

3.With concealed damage, carrier must be notified as soon as possible - preferably within five days.

4.File the claim with the following support documents within a nine month statute of limitations.

Original or certified copy of the Bill of Lading, or indemnity bond.

Original paid freight bill or indemnity in lieu thereof.

Original or certified copy of the invoice, showing trade and other discounts or reductions.

Copy of the inspection report issued by carrier’s representative at the time damage is reported to carrier.

The carrier is responsible for making prompt inspection of damage and for a thorough investigation of each claim. The distributor or manu- facturer will not accept claims from dealers for transportation dam- age.

Keep this literature in a safe place for future reference.

TO THE INSTALLER

Before installing this unit, please read this manual thoroughly to familiarize yourself with specific items which must be adhered to, including but not limited to: unit maximum external static pressure, gas pressures, BTU input rating, proper electrical connections, cir- culating air temperature rise, minimum or maximum CFM, and mo- tor speed connections.

4

Image 4
Contents GCH95/GME95/GCH9 Table of Contents XIV. Startup Procedure & Adjustment XVII. Safety Circuit DescriptionXVIII. Troubleshooting XIX. MaintenanceCarbon Monoxide Poisoning Hazard Upflow/Horizontal Component IdentificationII. Safety Considerations What to do if YOU Smell GASElectrostatic Discharge ESD Precautions III. Product ApplicationIV. Location Requirements & Considerations GeneralClearances and Accessibility Suspended FurnaceFurnace Suspension Existing Furnace RemovalCombustion & Ventilation AIR Requirements Thermostat InfluencesThermostat Location See 5.3.3-a VII. Horizontal Applications & Considerations VI. Installation PositionsHorizontal Furnace Recommended Installation Positions VIII. Propane GAS /HIGH Altitude InstallationsAlternate Electrical and GAS Line Connections Drain PANDirect Vent Terminal Clearances IX. VENT/FLUE Pipe & Combustion AIR Pipe Dual Certification NON-DIRECT/DIRECT VentMaterials and Joining Methods Proper VENT/FLUE and Combustion AIR Piping PracticesIncreased Clearance Configuration Termination LocationsCanadian Venting Requirements Standard Furnace ConnectionsVent/Flue Pipe Cuts Alternate Furnace ConnectionsAlternate Vent/Flue Location NON-DIRECT Vent Single Pipe PipingDirect Vent Dual Pipe Piping Alternate Horizontal Vent Termination Dual Pipe Termination of Multiple Direct Vent FurnacesCondensate Drain Lines & Drain Trap Concentric Vent TerminationHose and Tube Identification Standard Right or Left Side Drain Hose ConnectionsDrain Trap Alternate VENT/FLUE Drain Hose ConnectionsUpright INSTALLATIONS-TRAP on Left Side Upright Standard Connections Left SideHorizontal Installations Right Side Down Upright Drain Trap Mounting Left or Right Side PanelLeft Side Down Horizontal Drain Trap Mounting Left or Right Side PanelWiring Harness XI. Electrical ConnectionsJunction Box Relocation Junction BOX RelocationThermostat Diagram Field Wiring for GME95 /AMEH96 Furnacewith 2-StageVolt Thermostat Wiring GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringVolt Humidifier Nals XII. GAS Supply and PipingGAS Piping Connections Rack, manifold or gas valve Horizontal Upflow Model Gas Piping ConnectionsPropane Gas Installation Typ Propane Gas Piping ChartXIII. Circulating AIR & Filters Propane GAS Tanks and PipingChecking Static Pressure 80% Furnace Shown, 90% Similar Duct Flange Cut OutsChecking Duct Static Bottom Return AIR Opening Upflow ModelsXIV. Startup Procedure & Adjustment Permanent Minimum Filter Area sq.Disposable Minimum Filter area sq. Filter LocationsWhite-Rodgers Model 36G54 Connected to Manometer White-Rodgers Model 36G54 Two-StageHoneywell Model VR9205 Connected to Manometer GAS Supply Pressure MeasurementMeasuring Inlet Gas Pressure Alt. Method GAS Manifold Pressure Measurement and AdjustmentGAS Input Rate Measurement Natural GAS only Temperature Rise Temperature Rise MeasurementCirculator Blower Speeds Circulator Blower FAN Timing Adjustment Setting Furnace Operating ModePower UP Heating ModePage XVIII. Troubleshooting XIX. Maintenance XX. Before Leaving AN Installation XXI. Repair & Replacement PartsTroubleshooting Chart No signalContinuously MH95 Blower Performance DataACSH96 AMEH96 GCH95 / GCH9115 GME95 Wiring Diagram MH950453,0704,0905D MH950703,0904,1155MH950905CX GME95 / AMEH96 GAS Vent Directly BELOW. Keep Clear of ALL Obstructions ExemptionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference