Goodman Mfg MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9 Temperature Rise Measurement

Page 36

3.Calculate the number of seconds per cubic foot (sec/ ft3) of gas being delivered to the furnace. If the dial is a one cubic foot dial, divide the number of seconds recorded in step 2 by one. If the dial is a two cubic foot dial, divide the number of seconds recorded in step 2 by two.

4.Calculate the furnace input in BTUs per hour (BTU/ hr). Input equals the installation’s gas heating value multiplied by a conversion factor (hours to seconds), divided by the number of seconds per cubic foot. The measured input must not be greater than the input indicated on the unit rating plate.

EXAMPLE:

Installation’s gas heating (HTG) value: 1,000 BTU/ft3 (Obtained from gas supplier)

Installation’s seconds per cubic foot: 34 sec/ ft3

Conversion Factor (hours to seconds): 3600 sec/hr Input = (Htg. value x 3600) ÷ seconds per cubic foot Input = (1,000 BTU/ft3 x 3600 sec/hr) ÷ 34 sec/ ft3 Input = 106,000 BTU/hr

This measured input must not be greater than the input indicated on the unit rating plate.

5.Turn ON gas and relight appliances turned off in step 1. Ensure all the appliances are functioning properly and that all pilot burners are operating.

TEMPERATURE RISE

Temperature rise must be within the range specified on the unit rating plate. An incorrect temperature rise may result in condens- ing in or overheating of the heat exchanger. An airflow and tem- perature rise table is provided in the Specification Sheet applicable to your model.

Determine and adjust temperature rise as follows:

1.Operate furnace with burners firing for approximately ten minutes. Ensure all registers are open and all duct dampers are in their final (fully or partially open) position.

2.Place thermometers in the return and supply ducts as close to the furnace as possible. Thermometers must not be influenced by radiant heat by being able to “see” the heat exchanger.

SUPPLY

AIR

blower speed to increase temperature rise. Refer to Startup Procedure and Adjustment -Circulator Blower Speeds for speed changing details.

CIRCULATOR BLOWER SPEEDS

WARNING

TO PREVENT PREMATURE FAILURE OF HEAT EXCHANGER, PROPERTY DAMAGE, PERSONAL INJURY OR DEATH, DO NOT ADJUST THE LIMIT CONTROL (FACTORY-SET).

This furnace is equipped with a multi-speed circulator blower. This blower provides ease in adjusting blower speeds. The Specifica- tion Sheet applicable to your model provides an airflow table, show- ing the relationship between airflow (CFM) and external static pres- sure (E.S.P.), for the proper selection of heating and cooling speeds. The cooling blower speed is shipped set on HIGH, and the heating blower speed is set as indicated in the Specification Sheet appli- cable to your model. These blower speeds should be adjusted by the installer to match the installation requirements so as to provide the correct heating temperature rise and correct cooling CFM.

To adjust the circulator blower speed, proceed as follows:

1.Turn OFF power to the furnace.

2.Select the heating and cooling blower speeds that match the installation requirements from the airflow table in the Specification Sheet.

3.Relocate desired motor leads to the circulator blower heat and cool speed terminals on the integrated control module. (Terminals are identified as LO HEAT-H, HI HEAT-H and COOL-H (hot)). If a heating speed and the cooling blower speed are the same, a jumper wire must be used between the heat and cool terminals.

4.Connect all unused blower motor leads to the “PARK” terminals on the integrated control module. Any leads not connected to the “PARK” terminals must be taped.

5.Turn ON power to furnace.

6.Verify proper temperature rise as outlined in Section XIV, Startup Procedure and Adjustment - Temperature Rise.

*MH95, ACSH96, GCH95, GCH9

Circulator Blower Speeds

LOW

RED

MEDIUM LOW

ORANGE

MEDIUM LOW

BLUE

HIGH

BLACK

COMMON/NEUTRAL

WHITE

RETURN

AIR

Temperature Rise Measurement

3.Subtract the return air temperature from the supply air temperature to determine the air temperature rise. Allow adequate time for thermometer readings to stabilize.

4.Adjust temperature rise by adjusting the circulator blower speed. Increase blower speed to reduce temperature rise. Decrease

AMEH96, GME95

Circulator Blower Speeds

T1-LOW

YELLOW

T2-MED-LOW

RED

T3-MED

ORANGE

T4-MED-HI

BLUE

T5-HI

BLACK

COMMON\NEUTRAL

WHITE

36

Image 36
Contents GCH95/GME95/GCH9 Table of Contents XIV. Startup Procedure & Adjustment XVII. Safety Circuit DescriptionXVIII. Troubleshooting XIX. MaintenanceCarbon Monoxide Poisoning Hazard Upflow/Horizontal Component IdentificationII. Safety Considerations What to do if YOU Smell GASElectrostatic Discharge ESD Precautions III. Product ApplicationIV. Location Requirements & Considerations GeneralClearances and Accessibility Suspended FurnaceFurnace Suspension Existing Furnace RemovalThermostat Influences Combustion & Ventilation AIR RequirementsThermostat Location See 5.3.3-a VI. Installation Positions VII. Horizontal Applications & ConsiderationsHorizontal Furnace Recommended Installation Positions VIII. Propane GAS /HIGH Altitude InstallationsAlternate Electrical and GAS Line Connections Drain PANDirect Vent Terminal Clearances IX. VENT/FLUE Pipe & Combustion AIR Pipe Dual Certification NON-DIRECT/DIRECT VentMaterials and Joining Methods Proper VENT/FLUE and Combustion AIR Piping PracticesIncreased Clearance Configuration Termination LocationsCanadian Venting Requirements Standard Furnace ConnectionsVent/Flue Pipe Cuts Alternate Furnace ConnectionsAlternate Vent/Flue Location NON-DIRECT Vent Single Pipe PipingDirect Vent Dual Pipe Piping Alternate Horizontal Vent Termination Dual Pipe Termination of Multiple Direct Vent FurnacesCondensate Drain Lines & Drain Trap Concentric Vent TerminationHose and Tube Identification Standard Right or Left Side Drain Hose ConnectionsDrain Trap Alternate VENT/FLUE Drain Hose ConnectionsUpright INSTALLATIONS-TRAP on Left Side Upright Standard Connections Left SideHorizontal Installations Right Side Down Upright Drain Trap Mounting Left or Right Side PanelLeft Side Down Horizontal Drain Trap Mounting Left or Right Side PanelWiring Harness XI. Electrical ConnectionsJunction Box Relocation Junction BOX RelocationThermostat Diagram Field Wiring for GME95 /AMEH96 Furnacewith 2-StageVolt Thermostat Wiring GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringNals XII. GAS Supply and Piping Volt HumidifierGAS Piping Connections Rack, manifold or gas valve Horizontal Upflow Model Gas Piping ConnectionsPropane Gas Installation Typ Propane Gas Piping ChartXIII. Circulating AIR & Filters Propane GAS Tanks and PipingChecking Static Pressure 80% Furnace Shown, 90% Similar Duct Flange Cut OutsChecking Duct Static Bottom Return AIR Opening Upflow ModelsXIV. Startup Procedure & Adjustment Permanent Minimum Filter Area sq.Disposable Minimum Filter area sq. Filter LocationsWhite-Rodgers Model 36G54 Connected to Manometer White-Rodgers Model 36G54 Two-StageHoneywell Model VR9205 Connected to Manometer GAS Supply Pressure MeasurementGAS Manifold Pressure Measurement and Adjustment Measuring Inlet Gas Pressure Alt. MethodGAS Input Rate Measurement Natural GAS only Temperature Rise Measurement Temperature RiseCirculator Blower Speeds Circulator Blower FAN Timing Adjustment Setting Furnace Operating ModePower UP Heating ModePage XVIII. Troubleshooting XIX. Maintenance XX. Before Leaving AN Installation XXI. Repair & Replacement PartsTroubleshooting Chart No signalContinuously MH95 Blower Performance DataACSH96 AMEH96 GCH95 / GCH9115 GME95 Wiring Diagram MH950453,0704,0905D MH950703,0904,1155MH950905CX GME95 / AMEH96 GAS Vent Directly BELOW. Keep Clear of ALL Obstructions ExemptionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference