Goodman Mfg GAS-FIRED WARM AIR FURNACE XX. Before Leaving AN Installation

Page 41

6.Remove the recuperator coil turbulators individually by slowly pulling each turbulator forward firmly.

7.Clean the recuperator coil tubes using a long handle wire brush, such as a gun cleaning brush.

8.Clean the primary heat exchanger tubes using a wire brush attached to a length of high grade stainless steel cable, such as drain cleanout cable. Attach a variable speed reversible drill to the other end of the cable. Slowly rotate the cable with the drill and insert it into one of the heat exchanger tubes. While reversing the drill, work the cable in and out several times to obtain sufficient cleaning. Repeat for each tube.

9.Clean residue from furnace using a vacuum cleaner.

10.Replace the parts removed in the previous steps in reverse order.

11.Turn on electrical power and gas to furnace. Check for leaks and proper unit operation.

12.Severe heat exchanger fouling is an indication of an operational problem. Perform the checks listed in Section XIV, Startup Procedure and Adjustments to reduce the chances of repeated fouling.

XX.BEFORE LEAVING AN INSTALLATION

Cycle the furnace with the thermostat at least three times. Verify cooling and fan only operation.

Review the Owner’s Manual with the homeowner and discuss proper furnace operation and maintenance.

Leave literature packet near furnace.

XXI. REPAIR & REPLACEMENT PARTS

When ordering any of the listed functional parts, be sure to provide the furnace model, manufacturing, and serial numbers with the order.

Although only functional parts are shown in the parts list, all sheet metal parts, doors, etc. may be ordered by description.

Parts are available from your distributor.

Functional Parts List-

 

Gas Valve

Blower Motor

Gas Manifold

Blower Wheel

Natural Gas Orifice

Blower Mounting Bracket

Propane Gas Orifice

Blower Cutoff

Igniter

Blower Housing

Flame Sensor

Capacitor

Rollout Limit Switch

Heat Exchanger

Primary Limit Switch

Coil Front Cover

Auxiliary Limit Switch

Integrated Control Module

Pressure Switch

Transformer

Induced Draft Blower

 

Door Switch

 

41

Image 41
Contents GCH95/GME95/GCH9 Table of Contents XVII. Safety Circuit Description XIV. Startup Procedure & AdjustmentXVIII. Troubleshooting XIX. MaintenanceCarbon Monoxide Poisoning Hazard Component Identification Upflow/HorizontalWhat to do if YOU Smell GAS II. Safety ConsiderationsIII. Product Application Electrostatic Discharge ESD PrecautionsGeneral IV. Location Requirements & ConsiderationsSuspended Furnace Clearances and AccessibilityFurnace Suspension Existing Furnace RemovalThermostat Location Thermostat InfluencesCombustion & Ventilation AIR Requirements See 5.3.3-a Horizontal Furnace VI. Installation PositionsVII. Horizontal Applications & Considerations VIII. Propane GAS /HIGH Altitude Installations Recommended Installation PositionsAlternate Electrical and GAS Line Connections Drain PANDirect Vent Terminal Clearances Dual Certification NON-DIRECT/DIRECT Vent IX. VENT/FLUE Pipe & Combustion AIR PipeMaterials and Joining Methods Proper VENT/FLUE and Combustion AIR Piping PracticesTermination Locations Increased Clearance ConfigurationCanadian Venting Requirements Standard Furnace ConnectionsAlternate Furnace Connections Vent/Flue Pipe CutsNON-DIRECT Vent Single Pipe Piping Alternate Vent/Flue LocationDirect Vent Dual Pipe Piping Termination of Multiple Direct Vent Furnaces Alternate Horizontal Vent Termination Dual PipeCondensate Drain Lines & Drain Trap Concentric Vent TerminationStandard Right or Left Side Drain Hose Connections Hose and Tube IdentificationAlternate VENT/FLUE Drain Hose Connections Drain TrapUpright Standard Connections Left Side Upright INSTALLATIONS-TRAP on Left SideUpright Drain Trap Mounting Left or Right Side Panel Horizontal Installations Right Side DownHorizontal Drain Trap Mounting Left or Right Side Panel Left Side DownXI. Electrical Connections Wiring HarnessJunction Box Relocation Junction BOX RelocationField Wiring for GME95 /AMEH96 Furnacewith 2-Stage Thermostat DiagramVolt Thermostat Wiring GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringGAS Piping Connections Nals XII. GAS Supply and PipingVolt Humidifier Rack, manifold or gas valve Gas Piping Connections Horizontal Upflow ModelPropane Gas Piping Chart Propane Gas Installation TypXIII. Circulating AIR & Filters Propane GAS Tanks and PipingDuct Flange Cut Outs Checking Static Pressure 80% Furnace Shown, 90% SimilarChecking Duct Static Bottom Return AIR Opening Upflow ModelsPermanent Minimum Filter Area sq. XIV. Startup Procedure & AdjustmentDisposable Minimum Filter area sq. Filter LocationsWhite-Rodgers Model 36G54 Two-Stage White-Rodgers Model 36G54 Connected to ManometerHoneywell Model VR9205 Connected to Manometer GAS Supply Pressure MeasurementGAS Input Rate Measurement Natural GAS only GAS Manifold Pressure Measurement and AdjustmentMeasuring Inlet Gas Pressure Alt. Method Circulator Blower Speeds Temperature Rise MeasurementTemperature Rise Setting Furnace Operating Mode Circulator Blower FAN Timing AdjustmentPower UP Heating ModePage XVIII. Troubleshooting XIX. Maintenance XXI. Repair & Replacement Parts XX. Before Leaving AN InstallationNo signal Troubleshooting ChartContinuously Blower Performance Data MH95ACSH96 AMEH96 GCH95 / GCH9115 GME95 MH950453,0704,0905D MH950703,0904,1155 Wiring DiagramMH950905CX GME95 / AMEH96 Exemptions GAS Vent Directly BELOW. Keep Clear of ALL ObstructionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference