Goodman Mfg MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9, GAS-FIRED WARM AIR FURNACE Drain Trap

Page 22

ALTERNATE VENT/FLUE DRAIN HOSE CONNECTIONS

Upright installations using the alternate vent/flue outlet will require “right-side only” drain hoses to be connected as follows. Refer to Vent/Flue Pipe and Combustion Air Pipe for details on alternate vent/flue pipe connection.

1.Remove the rubber plug from the right-side drain port on the front cover . Save for use in step 3.

2.Secure Hose A to front cover drain port with a red hose clamp. Route hose to rear right side panel grommet hole.

3.Remove grommet from front right-side panel drain hole. Seal hole in grommet with large end of plug. Reinstall grommet and plug into side panel drain hole.

4.Cut 1/4 inch from the end of the drain port on the externally mounted rubber elbow. Discard cut portion.

5.Insert Tube 1 into rubber elbow drain port and secure with a silver hose clamp. Angle tube toward trap.

6.Cut 17 3/4 inches from the long end of Hose B and discard.

7.Secure straight end of Hose B to exposed end of Tube 1 with a green hose clamp. Route hose toward right side panel grommet holes.

8.Insert short end of one Tube 2 through rear right side panel grommet drain hole. Secure tube to Hose A with a green hose clamp.

9.Insert short end of remaining Tube 2 into Hose B from rubber elbow and secure with green hose clamp. Ensure hoses and tubes maintain a downward slope for proper drainage and are not kinked or binding.

RUBBER ELBOW

(EXTERNALLY

MOUNTED)

FRONT

 

COVER

HOSE B

DRAIN

PORT

 

RED HOSE

HOSE A

CLAMP

TUBE(S) 2

 

RUBBER

ELBOW

DRAIN PORT

SILVER HOSE CLAMP

TUBE 1

GREEN HOSE

CLAMPS

(3 PLACES)

DRAIN TRAP

Upright “Alternate: Connections - Right Side Only

(Upflow Shown, Counterflow Similar)

22

Image 22
Contents GCH95/GME95/GCH9 Table of Contents XVIII. Troubleshooting XIV. Startup Procedure & AdjustmentXVII. Safety Circuit Description XIX. MaintenanceCarbon Monoxide Poisoning Hazard Upflow/Horizontal Component IdentificationII. Safety Considerations What to do if YOU Smell GASElectrostatic Discharge ESD Precautions III. Product ApplicationIV. Location Requirements & Considerations GeneralFurnace Suspension Clearances and AccessibilitySuspended Furnace Existing Furnace RemovalCombustion & Ventilation AIR Requirements Thermostat InfluencesThermostat Location See 5.3.3-a VII. Horizontal Applications & Considerations VI. Installation PositionsHorizontal Furnace Alternate Electrical and GAS Line Connections Recommended Installation PositionsVIII. Propane GAS /HIGH Altitude Installations Drain PANDirect Vent Terminal Clearances Materials and Joining Methods IX. VENT/FLUE Pipe & Combustion AIR PipeDual Certification NON-DIRECT/DIRECT Vent Proper VENT/FLUE and Combustion AIR Piping PracticesCanadian Venting Requirements Increased Clearance ConfigurationTermination Locations Standard Furnace ConnectionsVent/Flue Pipe Cuts Alternate Furnace ConnectionsAlternate Vent/Flue Location NON-DIRECT Vent Single Pipe PipingDirect Vent Dual Pipe Piping Condensate Drain Lines & Drain Trap Alternate Horizontal Vent Termination Dual PipeTermination of Multiple Direct Vent Furnaces Concentric Vent TerminationHose and Tube Identification Standard Right or Left Side Drain Hose ConnectionsDrain Trap Alternate VENT/FLUE Drain Hose ConnectionsUpright INSTALLATIONS-TRAP on Left Side Upright Standard Connections Left SideHorizontal Installations Right Side Down Upright Drain Trap Mounting Left or Right Side PanelLeft Side Down Horizontal Drain Trap Mounting Left or Right Side PanelJunction Box Relocation Wiring HarnessXI. Electrical Connections Junction BOX RelocationVolt Thermostat Wiring Thermostat DiagramField Wiring for GME95 /AMEH96 Furnacewith 2-Stage GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringVolt Humidifier Nals XII. GAS Supply and PipingGAS Piping Connections Rack, manifold or gas valve Horizontal Upflow Model Gas Piping ConnectionsXIII. Circulating AIR & Filters Propane Gas Installation TypPropane Gas Piping Chart Propane GAS Tanks and PipingChecking Duct Static Checking Static Pressure 80% Furnace Shown, 90% SimilarDuct Flange Cut Outs Bottom Return AIR Opening Upflow ModelsDisposable Minimum Filter area sq. XIV. Startup Procedure & AdjustmentPermanent Minimum Filter Area sq. Filter LocationsHoneywell Model VR9205 Connected to Manometer White-Rodgers Model 36G54 Connected to ManometerWhite-Rodgers Model 36G54 Two-Stage GAS Supply Pressure MeasurementMeasuring Inlet Gas Pressure Alt. Method GAS Manifold Pressure Measurement and AdjustmentGAS Input Rate Measurement Natural GAS only Temperature Rise Temperature Rise MeasurementCirculator Blower Speeds Power UP Circulator Blower FAN Timing AdjustmentSetting Furnace Operating Mode Heating ModePage XVIII. Troubleshooting XIX. Maintenance XX. Before Leaving AN Installation XXI. Repair & Replacement PartsTroubleshooting Chart No signalContinuously MH95 Blower Performance DataACSH96 AMEH96 GCH95 / GCH9115 GME95 Wiring Diagram MH950453,0704,0905D MH950703,0904,1155MH950905CX GME95 / AMEH96 GAS Vent Directly BELOW. Keep Clear of ALL Obstructions ExemptionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference