Goodman Mfg GAS-FIRED WARM AIR FURNACE, MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9 Left Side Down

Page 25

LEFT SIDE DOWN

Horizontal installations with the left side panel down will require drain hoses to be connected to the left side front cover drain port and the side drain port on the rubber elbow.

1.Remove the rubber plug from the front cover left (down) side drain port.

2.Relocate the front cover pressure switch hose connection from the right side (as shipped) pressure tap to the left (down) side tap. The pressure switch hose must be connected to the down side to guard against blocked drain conditions. Cut hose to appropriate length to minimize sagging. Plug right (unused) pressure tap with plug removed from left side.

3.Secure Hose A to front cover drain port with a red hose clamp. Route hose to rear left (down) side panel grommet holes. NOTE: For left side drainage, grommets must be relocated to left side panel.

4.Remove the rubber cap from the side drain port on the rubber elbow.

5.Secure the short end of Hose B to rubber elbow side drain port using a green hose clamp. NOTE: For left side drainage, route hose to far left (down) side panel grommet holes. NOTE: Horizontal left side connections (when using new side port drain elbow) does not require connecting a hose to the induced draft blower housing.

6.Cut 5 1/2 inches straight length from the long end of each Tube 2 and discard radius ends.

7.Insert approximately one inch of each Tube 2 through left side panel grommet hole. Secure tubes to Hose A and Hose B with a green hose clamps. NOTE: Tube must reach bottom of trap. Ensure hoses and tubes maintain a downward slope for proper drainage and that they are not kinked or binding.

For details concerning mounting of the drain trap, refer to Conden- sate Drain Lines and Drain Trap - Horizontal Drain Trap Mounting.

 

 

GREEN HOSE

 

 

CLAMP

 

 

HOSE B

 

FRONT

HOSE A

 

COVER

 

PRESSURE

 

 

TAP

 

 

 

GREEN HOSE

 

 

CLAMP

LEFT SIDE

FRONT COVER

TUBE(S) 2

PANEL

 

 

DRAIN PORT

 

 

RED HOSE CLAMP

DRAIN TRAP

SIDE PANEL

GROMMET

HOLES

Horizontal Connections - Left Side Down

(Upflow Shown, Counterflow Similar)

HORIZONTAL DRAIN TRAP MOUNTING (LEFT OR RIGHT SIDE PANEL)

1.Position the drain trap against side panel with drain tubes inserted into trap. Note that the trap may be orientated with the outlet facing either the furnace’s top cover or base pan.

2.Secure drain trap to side panel at the dimples or crosshairs located on either side of the grommet drain holes.

3.Confirm that tubes reach bottom of drain trap and that all hoses maintain a downward slope and are not kinked or binding.

4.Attach PVC drain line to drain trap outlet with either a 90° elbow or coupling.

25

Image 25
Contents GCH95/GME95/GCH9 Table of Contents XVII. Safety Circuit Description XIV. Startup Procedure & AdjustmentXVIII. Troubleshooting XIX. MaintenanceCarbon Monoxide Poisoning Hazard Component Identification Upflow/HorizontalWhat to do if YOU Smell GAS II. Safety ConsiderationsIII. Product Application Electrostatic Discharge ESD PrecautionsGeneral IV. Location Requirements & ConsiderationsSuspended Furnace Clearances and AccessibilityFurnace Suspension Existing Furnace RemovalCombustion & Ventilation AIR Requirements Thermostat InfluencesThermostat Location See 5.3.3-a VII. Horizontal Applications & Considerations VI. Installation PositionsHorizontal Furnace VIII. Propane GAS /HIGH Altitude Installations Recommended Installation PositionsAlternate Electrical and GAS Line Connections Drain PANDirect Vent Terminal Clearances Dual Certification NON-DIRECT/DIRECT Vent IX. VENT/FLUE Pipe & Combustion AIR PipeMaterials and Joining Methods Proper VENT/FLUE and Combustion AIR Piping PracticesTermination Locations Increased Clearance ConfigurationCanadian Venting Requirements Standard Furnace ConnectionsAlternate Furnace Connections Vent/Flue Pipe CutsNON-DIRECT Vent Single Pipe Piping Alternate Vent/Flue LocationDirect Vent Dual Pipe Piping Termination of Multiple Direct Vent Furnaces Alternate Horizontal Vent Termination Dual PipeCondensate Drain Lines & Drain Trap Concentric Vent TerminationStandard Right or Left Side Drain Hose Connections Hose and Tube IdentificationAlternate VENT/FLUE Drain Hose Connections Drain TrapUpright Standard Connections Left Side Upright INSTALLATIONS-TRAP on Left SideUpright Drain Trap Mounting Left or Right Side Panel Horizontal Installations Right Side DownHorizontal Drain Trap Mounting Left or Right Side Panel Left Side DownXI. Electrical Connections Wiring HarnessJunction Box Relocation Junction BOX RelocationField Wiring for GME95 /AMEH96 Furnacewith 2-Stage Thermostat DiagramVolt Thermostat Wiring GME95/AMEH96 Furnace with 2-STAGE Condenser Field WiringVolt Humidifier Nals XII. GAS Supply and PipingGAS Piping Connections Rack, manifold or gas valve Gas Piping Connections Horizontal Upflow ModelPropane Gas Piping Chart Propane Gas Installation TypXIII. Circulating AIR & Filters Propane GAS Tanks and PipingDuct Flange Cut Outs Checking Static Pressure 80% Furnace Shown, 90% SimilarChecking Duct Static Bottom Return AIR Opening Upflow ModelsPermanent Minimum Filter Area sq. XIV. Startup Procedure & AdjustmentDisposable Minimum Filter area sq. Filter LocationsWhite-Rodgers Model 36G54 Two-Stage White-Rodgers Model 36G54 Connected to ManometerHoneywell Model VR9205 Connected to Manometer GAS Supply Pressure MeasurementMeasuring Inlet Gas Pressure Alt. Method GAS Manifold Pressure Measurement and AdjustmentGAS Input Rate Measurement Natural GAS only Temperature Rise Temperature Rise MeasurementCirculator Blower Speeds Setting Furnace Operating Mode Circulator Blower FAN Timing AdjustmentPower UP Heating ModePage XVIII. Troubleshooting XIX. Maintenance XXI. Repair & Replacement Parts XX. Before Leaving AN InstallationNo signal Troubleshooting ChartContinuously Blower Performance Data MH95ACSH96 AMEH96 GCH95 / GCH9115 GME95 MH950453,0704,0905D MH950703,0904,1155 Wiring DiagramMH950905CX GME95 / AMEH96 Exemptions GAS Vent Directly BELOW. Keep Clear of ALL ObstructionsThis page Left Intentionally Blank This page Left Intentionally Blank This page Left Intentionally Blank Quality Makes the Difference